EUVIMEDEUVIMED entdecken
Crossref

Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport

Fa In Yang

Korean Public Administration Review · 25.06.2026 · 60 (2) · 129-160

DOI: 10.18333/kpar.60.2.129 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Korean Public Administration Review, online erschienen am 25.06.2026. Verfasst von Fa In Yang.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Yang, F. I. (2026). Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport. Korean Public Administration Review, 60(2), 129-160. https://doi.org/10.18333/kpar.60.2.129

Vancouver

Yang FI. Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport. Korean Public Administration Review. 2026;60(2):129-160. doi:10.18333/kpar.60.2.129

BibTeX
@article{Yang2026,
  author = {Yang, Fa In},
  title = {Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport},
  journal = {Korean Public Administration Review},
  year = {2026},
  volume = {60},
  number = {2},
  pages = {129--160},
  doi = {10.18333/kpar.60.2.129}
}
Kostenlos starten →