Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport
Korean Public Administration Review · 25.06.2026 · 60 (2) · 129-160
DOI: 10.18333/kpar.60.2.129 ↗Kurz gefasst
Fachartikel in der Zeitschrift Korean Public Administration Review, online erschienen am 25.06.2026. Verfasst von Fa In Yang.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Yang, F. I. (2026). Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport. Korean Public Administration Review, 60(2), 129-160. https://doi.org/10.18333/kpar.60.2.129
Vancouver
Yang FI. Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport. Korean Public Administration Review. 2026;60(2):129-160. doi:10.18333/kpar.60.2.129
BibTeX
@article{Yang2026,
author = {Yang, Fa In},
title = {Temporal-Structural Distortion of Accountability and Foreseen Failure: Administrative Responsibility in Long-Term National Projects Through the Case of Muan Airport},
journal = {Korean Public Administration Review},
year = {2026},
volume = {60},
number = {2},
pages = {129--160},
doi = {10.18333/kpar.60.2.129}
}
EUVIMED