EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC 4.0

Applied Research on Software Progress Measurement: Taking B2B Project of A Company as an Example

Shuangxi Zhang, Norriza Hussin

Business Administration and Management · 2020

DOI: 10.18282/bam.v2i1.1081 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Business Administration and Management, 2020. Verfasst von Shuangxi Zhang und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Because of the limitations of Earned Value Management (EVM), there are great defects in managing software progress. Although Earned Schedule (ES) improves EVM, it is not reliable to utilize cost data to measure software progress. In 2014, Earned Duration Management (EDM), which is a new measurement method, was introduced. In this paper, via a practical case, the EDM method is used to measure the software progress.

Zitieren

APA

Zhang, S., & Hussin, N. (2020). Applied Research on Software Progress Measurement: Taking B2B Project of A Company as an Example. Business Administration and Management. https://doi.org/10.18282/bam.v2i1.1081

Vancouver

Zhang S, Hussin N. Applied Research on Software Progress Measurement: Taking B2B Project of A Company as an Example. Business Administration and Management. 2020. doi:10.18282/bam.v2i1.1081

BibTeX
@article{Zhang2020,
  author = {Zhang, Shuangxi and Hussin, Norriza},
  title = {Applied Research on Software Progress Measurement: Taking B2B Project of A Company as an Example},
  journal = {Business Administration and Management},
  year = {2020},
  doi = {10.18282/bam.v2i1.1081}
}
Kostenlos starten →