Features of the pre-project stage of work on a new redevelopment project in the conditions of the regulations of the historical settlement and the joint protection zone of IP Samara. Part 1
Urban construction and architecture · 22.06.2026 · 16 (2) · 109-118
DOI: 10.17673/vestnik.2026.02.14 ↗Kurz gefasst
Fachartikel in der Zeitschrift Urban construction and architecture, online erschienen am 22.06.2026. Verfasst von Viktor An. Lazarev und 1 weiteren Autor:innen. Die Arbeit nennt 16 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The process of design and construction in the historical settlement of Samara in the conditions of the regulations of the Project of the combined security zone at each stage is based on strict compliance with all regulatory documents that are given in strict sequence in this article. The result is a holistic methodology of work for designers in the historical core of the city. All stages of ‒ from the analysis of the site to the actual completion of construction are considered in detail and reasonably, specific regional features of the historical and architectural environment of Samara are shown. Its main feature ‒ the value of the preserved mid-rise historical buildings in its diversity and polystylism.
Zitieren
APA
Lazarev, V. A., & Akhmedova, E. A. (2026). Features of the pre-project stage of work on a new redevelopment project in the conditions of the regulations of the historical settlement and the joint protection zone of IP Samara. Part 1. Urban construction and architecture, 16(2), 109-118. https://doi.org/10.17673/vestnik.2026.02.14
Vancouver
Lazarev VA, Akhmedova EA. Features of the pre-project stage of work on a new redevelopment project in the conditions of the regulations of the historical settlement and the joint protection zone of IP Samara. Part 1. Urban construction and architecture. 2026;16(2):109-118. doi:10.17673/vestnik.2026.02.14
BibTeX
@article{Lazarev2026,
author = {Lazarev, Viktor An. and Akhmedova, Elena Al.},
title = {Features of the pre-project stage of work on a new redevelopment project in the conditions of the regulations of the historical settlement and the joint protection zone of IP Samara. Part 1},
journal = {Urban construction and architecture},
year = {2026},
volume = {16},
number = {2},
pages = {109--118},
doi = {10.17673/vestnik.2026.02.14}
}
EUVIMED