A WMOPP-GM MODEL FOR ESTIMATING THE COST OF GREEN BUILDING PROJECT IN THE SOUTH-EAST NIGERIA
Advances and Applications in Discrete Mathematics · 18.05.2026 · 43 (5) · 611-625
DOI: 10.17654/0974165826039 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances and Applications in Discrete Mathematics, online erschienen am 18.05.2026. Verfasst von Ibeawuchi I. Echeme und 11 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
In this paper, we developed a posynomial model for estimating the cost of green buildings in the South-East Nigeria. Green building is in line with the building philosophy of the inhabitants of the old South-East Nigeria. We collected secondary data on the cost of materials for a four-bedroom bungalow green building to test the workability of the model. The model accounts for the multi-objective nature of the component parts of the building. We obtained the Pareto optimal cost of constructing such a building to be N8,148,335.00 and determined the dimensions (length, width, and height) of the building.
Zitieren
APA
Echeme, I. I., Amuji, H. O., Nwankwo, S. I., Nwachi, C. C., Anya, C. U., Okwara, I. D., Okeoma, I. O., Elias, A. U., Iwuji, J. C., Ohaeri, E. O., Amaechi, L. N., & Nwachi, J. C. (2026). A WMOPP-GM MODEL FOR ESTIMATING THE COST OF GREEN BUILDING PROJECT IN THE SOUTH-EAST NIGERIA. Advances and Applications in Discrete Mathematics, 43(5), 611-625. https://doi.org/10.17654/0974165826039
Vancouver
Echeme II, Amuji HO, Nwankwo SI, Nwachi CC, Anya CU, Okwara ID, et al. A WMOPP-GM MODEL FOR ESTIMATING THE COST OF GREEN BUILDING PROJECT IN THE SOUTH-EAST NIGERIA. Advances and Applications in Discrete Mathematics. 2026;43(5):611-625. doi:10.17654/0974165826039
BibTeX
@article{Echeme2026,
author = {Echeme, Ibeawuchi I. and Amuji, Harrison O. and Nwankwo, Stephen I. and Nwachi, Christy C. and Anya, Collins U. and Okwara, Ihuoma D. and Okeoma, Immaculata O. and Elias, Andy U. and Iwuji, Joy C. and Ohaeri, Evangelina O. and Amaechi, Louisa N. and Nwachi, Josephine C.},
title = {A WMOPP-GM MODEL FOR ESTIMATING THE COST OF GREEN BUILDING PROJECT IN THE SOUTH-EAST NIGERIA},
journal = {Advances and Applications in Discrete Mathematics},
year = {2026},
volume = {43},
number = {5},
pages = {611--625},
doi = {10.17654/0974165826039}
}
EUVIMED