Semi-Markov Analysis of a Two-Unit Warm Standby System with Inspection-Based Decisions, Preventive Maintenance, and Preemptive-Resume Priority
Eksploatacja i Niezawodność – Maintenance and Reliability · 23.11.2026
DOI: 10.17531/ein/242320 ↗Kurz gefasst
Fachartikel in der Zeitschrift Eksploatacja i Niezawodność – Maintenance and Reliability, online erschienen am 23.11.2026. Verfasst von Hany Mohamed Hamouda. Die Arbeit nennt 26 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Reliable operation of software-intensive computer systems requires maintenance strategies that account for hardware and software failure characteristics. This paper develops a stochastic reliability and economic model for a two-unit warm standby system attended by a single server performing inspection, repair, replacement, software upgrading, and preventive maintenance. The framework integrates inspection-based repair-or-replacement decisions with a preemptive-resume priority discipline, whereby software upgrading interrupts ongoing hardware maintenance and resumes after completion. This combination — within a unified semi-Markov framework — has not been previously addressed in the literature. System behavior is modeled using semi-Markov processes and regenerative point techniques. Closed-form expressions are derived for the Mean Time to System Failure, steady-state availability, server busy fractions, and expected profit per unit time. Sensitivity analyses and a comparative study with a non-priority policy confirm measurable improvements in availability and profitability.
Zitieren
APA
Hamouda, H. M. (2026). Semi-Markov Analysis of a Two-Unit Warm Standby System with Inspection-Based Decisions, Preventive Maintenance, and Preemptive-Resume Priority. Eksploatacja i Niezawodność – Maintenance and Reliability. https://doi.org/10.17531/ein/242320
Vancouver
Hamouda HM. Semi-Markov Analysis of a Two-Unit Warm Standby System with Inspection-Based Decisions, Preventive Maintenance, and Preemptive-Resume Priority. Eksploatacja i Niezawodność – Maintenance and Reliability. 2026. doi:10.17531/ein/242320
BibTeX
@article{Hamouda2026,
author = {Hamouda, Hany Mohamed},
title = {Semi-Markov Analysis of a Two-Unit Warm Standby System with Inspection-Based Decisions, Preventive Maintenance, and Preemptive-Resume Priority},
journal = {Eksploatacja i Niezawodność – Maintenance and Reliability},
year = {2026},
doi = {10.17531/ein/242320}
}
EUVIMED