EUVIMEDEUVIMED entdecken
Crossref

A Novel Dam Safety Risk Assessment Approach Incorporating the Human Factors System and the Incentive-Variable Weight Method

Huiwen Wang, Jinbao Sheng, Dandan Li, Kai Dong, Peiran Jing

Eksploatacja i Niezawodność – Maintenance and Reliability · 23.03.2026

DOI: 10.17531/ein/219157 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Eksploatacja i Niezawodność – Maintenance and Reliability, online erschienen am 23.03.2026. Verfasst von Huiwen Wang und 4 weiteren Autor:innen. Die Arbeit nennt 61 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

An improved calculation method for dam failure probability that considers human factors was developed to incorporate human error parameters into engineering risk analysis in this study. Firstly, the human factors indicator system with human, technology, organization, and environment as guideline layers was constructed. The assignment of indicators was accomplished using game theory to simultaneously reflect the experts’ subjective opinions and the objective information in historical data. A key innovation was the incorporation of the incentive-variable weighting method, which enabled dynamic assignment of top-level indicators and accounted for the influence of weak factors on the failure probability, as well as dynamic calculation across multiple combinations of failing causes. Finally, a new human-driven variable-weighted dam risk dynamic assessment methodology was developed by combining the consequences of dam failure to reflect risk. The novel method has been applied to dam group examples, intuitively reflecting the risk order of different small dams.

Zitieren

APA

Wang, H., Sheng, J., Li, D., Dong, K., & Jing, P. (2026). A Novel Dam Safety Risk Assessment Approach Incorporating the Human Factors System and the Incentive-Variable Weight Method. Eksploatacja i Niezawodność – Maintenance and Reliability. https://doi.org/10.17531/ein/219157

Vancouver

Wang H, Sheng J, Li D, Dong K, Jing P. A Novel Dam Safety Risk Assessment Approach Incorporating the Human Factors System and the Incentive-Variable Weight Method. Eksploatacja i Niezawodność – Maintenance and Reliability. 2026. doi:10.17531/ein/219157

BibTeX
@article{Wang2026,
  author = {Wang, Huiwen and Sheng, Jinbao and Li, Dandan and Dong, Kai and Jing, Peiran},
  title = {A Novel Dam Safety Risk Assessment Approach Incorporating the Human Factors System and the Incentive-Variable Weight Method},
  journal = {Eksploatacja i Niezawodność – Maintenance and Reliability},
  year = {2026},
  doi = {10.17531/ein/219157}
}
Kostenlos starten →