EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Intermittent Demand Forecasting of Aircraft Components through Installed Base Forecasting: A Case Study

Anu Anuththara Perera, Upeksha Senanayake, H. Niles Perera, Maria Rosienkiewicz

Eksploatacja i Niezawodność – Maintenance and Reliability · 26.02.2026

DOI: 10.17531/ein/218545 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Eksploatacja i Niezawodność – Maintenance and Reliability, online erschienen am 26.02.2026. Verfasst von Anu Anuththara Perera und 3 weiteren Autor:innen. Die Arbeit nennt 48 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This research addresses the inefficiencies in traditional forecasting methods for the intermittent and erratic demand for aircraft components, which typically results to either high inventory costs or expensive aircraft-on-ground situations from stockouts. The main objective is to build an enhanced forecasting model that uses installed base information to improve demand forecasting accuracy for aircraft components. An extensive literature review followed by a Delphi method study is used to identify the significant contextual factors impacting the demand and integrated into an Artificial Neural Network forecasting model. The model's performance is evaluated using Mean Squared Error and benchmarked against the Croston method. This research provides efficient forecasting practices to the airline industry, aiming to reduce operating expenses and improve maintenance as well as service quality.

Zitieren

APA

Perera, A. A., Senanayake, U., Perera, H. N., & Rosienkiewicz, M. (2026). Intermittent Demand Forecasting of Aircraft Components through Installed Base Forecasting: A Case Study. Eksploatacja i Niezawodność – Maintenance and Reliability. https://doi.org/10.17531/ein/218545

Vancouver

Perera AA, Senanayake U, Perera HN, Rosienkiewicz M. Intermittent Demand Forecasting of Aircraft Components through Installed Base Forecasting: A Case Study. Eksploatacja i Niezawodność – Maintenance and Reliability. 2026. doi:10.17531/ein/218545

BibTeX
@article{Perera2026,
  author = {Perera, Anu Anuththara and Senanayake, Upeksha and Perera, H. Niles and Rosienkiewicz, Maria},
  title = {Intermittent Demand Forecasting of Aircraft Components through Installed Base Forecasting: A Case Study},
  journal = {Eksploatacja i Niezawodność – Maintenance and Reliability},
  year = {2026},
  doi = {10.17531/ein/218545}
}
Kostenlos starten →