EUVIMEDEUVIMED entdecken
Crossref

Institutions, risk, and lifecycle: deconstructing a new perspective on BRI PPP success

Qiliang Hu, Chin-Hong Puah, Bowen Su

Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction · 16.11.2026 · 1-14

DOI: 10.1680/jsmic.26.00007 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, online erschienen am 16.11.2026. Verfasst von Qiliang Hu und 2 weiteren Autor:innen. Die Arbeit nennt 142 Literaturangaben. Gefördert von: Anhui Provincial Department of Education Quality Project Teaching Research Key Projects, Anhui University Research Project, Anhui Province Higher Education Teacher Training Project.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Ensuring the successful implementation of public–private partnership (PPP) projects in the countries involved is one of the major challenges to the Belt and Road Initiative (BRI). Although certain essential success variables have been discovered in earlier studies, a complete framework that integrates institutional, lifespan and risk perspectives is still lacking. This study addresses three questions: (1) What are the primary success determinants for PPP projects in BRI countries? (2) How do these characteristics alter across different stages of the project lifecycle? (3) What risk dimensions do they address. To address these problems, the authors undertook a systematic evaluation of 166 highly cited articles, supplemented with project data from the World Bank’s Private Participation in Infrastructure database. The results suggest that stable institutions, transparent procurement, and effective legal structures are highly important for the success of BRI PPP. This study also suggests that critical success factors (CSFs) are dynamic, transitioning from macro-level planning in the early phases to operational excellence in the construction and transfer phases, and that political, economic, and commercial risks should be tackled collectively. This study provides decision-support insights for governments and private investors, highlighting the interdependent roles of governance, risk management, and lifecycle phases to deliver effective PPPs.

Förderung

  • Anhui Provincial Department of Education Quality Project Teaching Research Key Projects
  • Anhui University Research Project
  • Anhui Province Higher Education Teacher Training Project

Zitieren

APA

Hu, Q., Puah, C., & Su, B. (2026). Institutions, risk, and lifecycle: deconstructing a new perspective on BRI PPP success. Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, 1-14. https://doi.org/10.1680/jsmic.26.00007

Vancouver

Hu Q, Puah C, Su B. Institutions, risk, and lifecycle: deconstructing a new perspective on BRI PPP success. Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction. 2026:1-14. doi:10.1680/jsmic.26.00007

BibTeX
@article{Hu2026,
  author = {Hu, Qiliang and Puah, Chin-Hong and Su, Bowen},
  title = {Institutions, risk, and lifecycle: deconstructing a new perspective on BRI PPP success},
  journal = {Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction},
  year = {2026},
  pages = {1--14},
  doi = {10.1680/jsmic.26.00007}
}
Kostenlos starten →