EUVIMEDEUVIMED entdecken
Crossref

Feasibility of long-term NDT programme for system-wide monitoring of bridge deck condition in Indiana, USA

Benjamin Taylor, Yu Qiao, Mark Bowman, Samuel Labi

Infrastructure Asset Management · 01.09.2018 · 5 (3) · 105-117

DOI: 10.1680/jinam.17.00034 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Infrastructure Asset Management, erschienen am 01.09.2018. Verfasst von Benjamin Taylor und 3 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 59 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Through effective and proactive monitoring, highway agencies can acquire information needed for deck repair or replacement timing decisions. However, system-wide monitoring of infrastructure requires a large expenditure outlay and therefore needs to be justified by comparing its costs to the potential savings if such monitoring leads to timely actions. This paper presents a framework that considers two strategies for managing a bridge deck network: a condition-based strategy that involves monitoring and repair and a time-based strategy that involves repairs at specific time intervals without condition monitoring. Using a case study, the paper calculates the life-cycle cost of each strategy as the sum of the monitoring and repair costs. The paper estimates that if a non-destructive test (NDT) is used as the monitoring platform system-wide, the unit monitoring cost will be $0·04–0·35/ft 2 ($0·43–3·77/m 2 ) of deck (average $0·22/ft 2 ($2·37/m 2 )). This cost is expected to be different for other inventories due to differences in age, inventory size and bridge proximities. The paper determines that the NDT monitoring programme benefits outweigh its costs ($3·68–10·42 rate of return in repair savings for every dollar of investment in that programme). The paper also analyses the sensitivity of the outcome to key evaluation factors.

Zitieren

APA

Taylor, B., Qiao, Y., Bowman, M., & Labi, S. (2018). Feasibility of long-term NDT programme for system-wide monitoring of bridge deck condition in Indiana, USA. Infrastructure Asset Management, 5(3), 105-117. https://doi.org/10.1680/jinam.17.00034

Vancouver

Taylor B, Qiao Y, Bowman M, Labi S. Feasibility of long-term NDT programme for system-wide monitoring of bridge deck condition in Indiana, USA. Infrastructure Asset Management. 2018;5(3):105-117. doi:10.1680/jinam.17.00034

BibTeX
@article{Taylor2018,
  author = {Taylor, Benjamin and Qiao, Yu and Bowman, Mark and Labi, Samuel},
  title = {Feasibility of long-term NDT programme for system-wide monitoring of bridge deck condition in Indiana, USA},
  journal = {Infrastructure Asset Management},
  year = {2018},
  volume = {5},
  number = {3},
  pages = {105--117},
  doi = {10.1680/jinam.17.00034}
}
Kostenlos starten →