EUVIMEDEUVIMED entdecken
Crossref

Mud pumping in the roadbed of ballastless high-speed railway

Xuecheng Bian, Zhangbo Wan, Chuang Zhao, Yujun Cui, Yunmin Chen

Géotechnique · 01.07.2023 · 73 (7) · 614-628

DOI: 10.1680/jgeot.21.00135 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Géotechnique, erschienen am 01.07.2023. Verfasst von Xuecheng Bian und 4 weiteren Autor:innen. Die Arbeit wurde bisher 41-mal zitiert (Crossref) und nennt 45 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Mud pumping that is deliberately avoided in the design of a ballastless high-speed railway still occurs and induces extraordinary track vibrations. In this study, in situ investigations and laboratory tests were performed to disclose the initiation and development of mud pumping detected in the field. The in situ investigations indicated that mud pumping principally appeared at both ends of the concrete base up to a maximum distance of 2 m. Precipitation, instead of groundwater, was found to be the water source triggering mud pumping; this infiltrated the graded gravel roadbed through the detachments of the ends of the overlying concrete bases due to the whipping effect. Once mud pumping occurred, the vibrations of concrete bases were aggravated and caused severe track settlements under train loads. The results of laboratory tests indicated that the infiltrated rainwater was retained in the roadbed above the less permeable subgrade, and the roadbed contained an unstable particle skeleton with excessive plastic fine particles, both of which provided favourable conditions to form mud pumping under dense high-speed train loads. Soil particles of less than 7·1 mm in diameter migrated during mud pumping; these first accumulated at the lower roadbed, then gradually migrated to the upper roadbed, actuated by the hydraulic gradient generated, and were finally pumped out through the detachments around the expansion gaps, thereby resulting in large amounts of voids in the roadbed and a vicious cycle if not treated in a timely fashion. These features of mud pumping in ballastless tracks differ from those of ballasted tracks and will benefit the development of remediation measures and improvement of slab track designs.

Zitieren

APA

Bian, X., Wan, Z., Zhao, C., Cui, Y., & Chen, Y. (2023). Mud pumping in the roadbed of ballastless high-speed railway. Géotechnique, 73(7), 614-628. https://doi.org/10.1680/jgeot.21.00135

Vancouver

Bian X, Wan Z, Zhao C, Cui Y, Chen Y. Mud pumping in the roadbed of ballastless high-speed railway. Géotechnique. 2023;73(7):614-628. doi:10.1680/jgeot.21.00135

BibTeX
@article{Bian2023,
  author = {Bian, Xuecheng and Wan, Zhangbo and Zhao, Chuang and Cui, Yujun and Chen, Yunmin},
  title = {Mud pumping in the roadbed of ballastless high-speed railway},
  journal = {Géotechnique},
  year = {2023},
  volume = {73},
  number = {7},
  pages = {614--628},
  doi = {10.1680/jgeot.21.00135}
}
Kostenlos starten →