Hill Dickinson Stadium for Everton Football Club: civil and water engineering
Proceedings of the Institution of Civil Engineers - Civil Engineering · 24.11.2026 · 1-11
DOI: 10.1680/jcien.25.00614 ↗Kurz gefasst
Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Civil Engineering, online erschienen am 24.11.2026. Verfasst von Fergus McCormick und 2 weiteren Autor:innen. Die Arbeit nennt 14 Literaturangaben.
Abstract (Originalsprache)
Hill Dickinson Stadium for Everton Football Club has been built on the site of Bramley-Moore Dock in Liverpool. The unique location created a series of unique engineering design challenges. These included refurbishment of the existing dock walls, infilling of the dock to provide the platform for the stadium, reconfiguration of the existing waterways of the dock and modifications to the existing boundary wall. All of these designs were undertaken being mindful of the historic setting and this paper discusses how the new designs were influenced by the heritage of the site. An outline of the stadium architecture is described, explaining its position over both existing wharves and the infilled dock, and the creation of a new fan plaza. Civil engineering design of pavements and drainage is discussed, explaining key challenges and care to deal sympathetically and creatively with existing heritage assets such as rail lines and the dock walls. Outline aspects of the stadium framing are presented. The planning and design activities described in this paper demonstrate how heritage values may be successfully balanced with the civil engineering requirements of a major project. Comprehensive site surveys were found to be a critical foundation to this process.
Zitieren
APA
McCormick, F., Vaughan-Shaw, M., & Hall, N. (2026). Hill Dickinson Stadium for Everton Football Club: civil and water engineering. Proceedings of the Institution of Civil Engineers - Civil Engineering, 1-11. https://doi.org/10.1680/jcien.25.00614
Vancouver
McCormick F, Vaughan-Shaw M, Hall N. Hill Dickinson Stadium for Everton Football Club: civil and water engineering. Proceedings of the Institution of Civil Engineers - Civil Engineering. 2026:1-11. doi:10.1680/jcien.25.00614
BibTeX
@article{McCormick2026,
author = {McCormick, Fergus and Vaughan-Shaw, Matthew and Hall, Nick},
title = {Hill Dickinson Stadium for Everton Football Club: civil and water engineering},
journal = {Proceedings of the Institution of Civil Engineers - Civil Engineering},
year = {2026},
pages = {1--11},
doi = {10.1680/jcien.25.00614}
}
EUVIMED