EUVIMEDEUVIMED entdecken
Crossref

Providing community energy for the London 2012 Olympic Park

Ruari Maybank, Mike Carr, Ian Guest, Bruce Laidlaw

Proceedings of the Institution of Civil Engineers - Energy · 2011

DOI: 10.1680/ener.11.00005 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Energy, 2011. Verfasst von Ruari Maybank und 3 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 2 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The UK Olympic Delivery Authority is responsible for providing infrastructure to serve the biggest sporting event in the world and support the long-term regeneration of east London. The scale of development for the London 2012 Olympic and Paralympic Games presented an opportunity to implement a sustainable, ‘low carbon’ development, central to which are two large energy centres and an extensive district heating and cooling network. This paper describes the challenges to implementing the community energy network and how these have been overcome to deliver utilities i#nfrastructure to a tight programme and with significant private sector investment.

Zitieren

APA

Maybank, R., Carr, M., Guest, I., & Laidlaw, B. (2011). Providing community energy for the London 2012 Olympic Park. Proceedings of the Institution of Civil Engineers - Energy. https://doi.org/10.1680/ener.11.00005

Vancouver

Maybank R, Carr M, Guest I, Laidlaw B. Providing community energy for the London 2012 Olympic Park. Proceedings of the Institution of Civil Engineers - Energy. 2011. doi:10.1680/ener.11.00005

BibTeX
@article{Maybank2011,
  author = {Maybank, Ruari and Carr, Mike and Guest, Ian and Laidlaw, Bruce},
  title = {Providing community energy for the London 2012 Olympic Park},
  journal = {Proceedings of the Institution of Civil Engineers - Energy},
  year = {2011},
  doi = {10.1680/ener.11.00005}
}
Kostenlos starten →