Operation of the 2030 GB power generation system
Proceedings of the Institution of Civil Engineers - Energy · 2011
DOI: 10.1680/ener.1000009 ↗Kurz gefasst
Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Energy, 2011. Verfasst von Annelies Gerber und 3 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref) und nennt 14 Literaturangaben.
Abstract (Originalsprache)
A GB electricity generation system for 2030 with a large amount of renewables is studied. Its ability to meet projected 2030 demand on a half-hourly basis is investigated for two extreme weeks of the year: winter maximum demand and summer minimum demand. For each week, either operating costs or carbon dioxide emissions were optimised. The effects of a carbon price of £30/t or £75/t on the power production of different generating units, the carbon intensity and operating costs are shown. Load reduction through demand-side management during the winter maximum demand week was necessary for 10–15 h. During the summer minimum demand week, wind curtailment of 5 GWh occurred only when carbon dioxide emissions were optimised.
Zitieren
APA
Gerber, A., Awad, B., Ekanayake, J. B., & Jenkins, N. (2011). Operation of the 2030 GB power generation system. Proceedings of the Institution of Civil Engineers - Energy. https://doi.org/10.1680/ener.1000009
Vancouver
Gerber A, Awad B, Ekanayake JB, Jenkins N. Operation of the 2030 GB power generation system. Proceedings of the Institution of Civil Engineers - Energy. 2011. doi:10.1680/ener.1000009
BibTeX
@article{Gerber2011,
author = {Gerber, Annelies and Awad, Bieshoy and Ekanayake, Janaka Bandara and Jenkins, Nicholas},
title = {Operation of the 2030 GB power generation system},
journal = {Proceedings of the Institution of Civil Engineers - Energy},
year = {2011},
doi = {10.1680/ener.1000009}
}
EUVIMED