Technical visit: Llyn Alaw reservoir stressed anchor stabilisation
Dams and Reservoirs · 2012
DOI: 10.1680/dare.13.00001 ↗Kurz gefasst
Fachartikel in der Zeitschrift Dams and Reservoirs, 2012. Verfasst von David Prisk.
Abstract (Originalsprache)
The British Dam Society (BDS) was invited to a site visit to Llyn Alaw reservoir to see the dam stabilisation works in progress. The visit was organised by Dwr Cymru Welsh Water to the Llyn Alaw reservoir and treatment works site where Black & Veatch are the principal contractor, Atkins have designed and are supervising the dam stabilisation works and BAM Ritchies are the specialist contractor designing part of the anchor system and installing the anchors. Ten members of the BDS attended the visit.
Zitieren
APA
Prisk, D. (2012). Technical visit: Llyn Alaw reservoir stressed anchor stabilisation. Dams and Reservoirs. https://doi.org/10.1680/dare.13.00001
Vancouver
Prisk D. Technical visit: Llyn Alaw reservoir stressed anchor stabilisation. Dams and Reservoirs. 2012. doi:10.1680/dare.13.00001
BibTeX
@article{Prisk2012,
author = {Prisk, David},
title = {Technical visit: Llyn Alaw reservoir stressed anchor stabilisation},
journal = {Dams and Reservoirs},
year = {2012},
doi = {10.1680/dare.13.00001}
}
EUVIMED