Investigation and treatment of post-construction incidents at Satpara Dam
Dams and Reservoirs · 2012
DOI: 10.1680/dare.12.00005 ↗Kurz gefasst
Fachartikel in der Zeitschrift Dams and Reservoirs, 2012. Verfasst von Zaheer Muhammad Malik und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 7 Literaturangaben.
Abstract (Originalsprache)
During the initial 5 years, spanning over the partial impounding stages of the Satpara Dam project, two independent post-construction incidents were observed at the project. This paper describes in detail the methods of investigation and treatment conducted for the unusual development of depressions observed slightly upstream of the main dam axis, and sinkholes observed upstream of the project area. The former incident was limited within the shell/shoulder zone and rehabilitated subsequently. The second incident was interconnected with a subsurface subsidence and its subsequent treatment was considered to induce self-healing within the natural foundations over time.
Zitieren
APA
Malik, Z. M., & Hussain, A. (2012). Investigation and treatment of post-construction incidents at Satpara Dam. Dams and Reservoirs. https://doi.org/10.1680/dare.12.00005
Vancouver
Malik ZM, Hussain A. Investigation and treatment of post-construction incidents at Satpara Dam. Dams and Reservoirs. 2012. doi:10.1680/dare.12.00005
BibTeX
@article{Malik2012,
author = {Malik, Zaheer Muhammad and Hussain, Abid},
title = {Investigation and treatment of post-construction incidents at Satpara Dam},
journal = {Dams and Reservoirs},
year = {2012},
doi = {10.1680/dare.12.00005}
}
EUVIMED