Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Civil Engineering, 2008-05. Verfasst von Andrew Wolstenholme und 2 weiteren Autor:innen. Die Arbeit wurde bisher 10-mal zitiert (Crossref) und nennt 4 Literaturangaben.
Abstract (Originalsprache)
The success of the five-year construction phase of Terminal 5 at London's Heathrow airport was dependent of putting into effect the principles of a unique form of contract, called the Terminal 5 agreement. The £4·3 billion scheme required the client to lead in areas that were typically the traditional domain of suppliers or contractor organisations, resulting in novel methods and relationships. From the early stages it was recognised that the project had to be delivered differently to the norm if it was to achieve its desired objectives. This resulted in the phrase that all those involved in the delivery of the T5 were part of ‘history in the making’.
Zitieren
APA
Wolstenholme, A., Fugeman, I., & Hammond, F. (2008). Heathrow Terminal 5: delivery strategy. Proceedings of the Institution of Civil Engineers - Civil Engineering, 161(5), 10-15. https://doi.org/10.1680/cien.2007.161.5.10
Vancouver
Wolstenholme A, Fugeman I, Hammond F. Heathrow Terminal 5: delivery strategy. Proceedings of the Institution of Civil Engineers - Civil Engineering. 2008;161(5):10-15. doi:10.1680/cien.2007.161.5.10
BibTeX
@article{Wolstenholme2008,
author = {Wolstenholme, Andrew and Fugeman, Ian and Hammond, Fiona},
title = {Heathrow Terminal 5: delivery strategy},
journal = {Proceedings of the Institution of Civil Engineers - Civil Engineering},
year = {2008},
volume = {161},
number = {5},
pages = {10--15},
doi = {10.1680/cien.2007.161.5.10}
}
EUVIMED