ADAPTIVE SYSTEM OF INDICATORS FOR MONITORING THE ECONOMIC EFFICIENCY OF BUSINESS PROCESS AUTOMATION IN CONSTRUCTION
REVIEW OF TRANSPORT ECONOMICS AND MANAGEMENT · 30.06.2026 · (15(31)) · 343-348
DOI: 10.15802/rtem2026/359505 ↗Kurz gefasst
Fachartikel in der Zeitschrift REVIEW OF TRANSPORT ECONOMICS AND MANAGEMENT, online erschienen am 30.06.2026. Verfasst von D.S. PODKOPAIEV.
Abstract (Originalsprache)
Purpose
To develop the theoretical and methodological foundations of an adaptive system of indicators for monitoring the economic efficiency of business process automation of construction enterprises based on the Low Code platform «Creatio», taking into account industry specifics, project dynamics, and stages of implementation. Methodology. The study is based on the application of a systemic approach, methods of economic-mathematical modeling, taxonomy, expert assessments, and a comparative «before/after» analysis of automation implementation. The definition of key indicators was carried out taking into account the specifics of construction business processes: contract work, estimate rationing, supply management, and control over the completion of stages.
Results
A three-level adaptive system of indicators (operational, tactical, strategic levels) is proposed, which includes quantitative and qualitative indicators: reduction of contract approval time, reduction of operational management costs, increase in inventory turnover, reduction of deviations of actual costs from the estimate. A method for calculating the integral indicator of economic efficiency with adaptive weight coefficients is developed. The system was tested on a conditional example of a construction company, which confirmed its operability. Scientific novelty. For the first time, an adaptive system of indicators for monitoring the economic efficiency of business process automation in construction is substantiated, which, unlike existing static models, takes into account the change of priorities depending on the type of construction projects (residential, industrial, infrastructure), the scale of the enterprise, and the stage of implementation of the «Creatio» platform. Practical significance. The developed system can be implemented in the activities of construction companies for operational monitoring of automation payback, substantiation of management decisions regarding further digital transformation, and increasing the transparency of project resource provision.
Zitieren
APA
PODKOPAIEV, D. (2026). ADAPTIVE SYSTEM OF INDICATORS FOR MONITORING THE ECONOMIC EFFICIENCY OF BUSINESS PROCESS AUTOMATION IN CONSTRUCTION. REVIEW OF TRANSPORT ECONOMICS AND MANAGEMENT, 343-348. https://doi.org/10.15802/rtem2026/359505
Vancouver
PODKOPAIEV D. ADAPTIVE SYSTEM OF INDICATORS FOR MONITORING THE ECONOMIC EFFICIENCY OF BUSINESS PROCESS AUTOMATION IN CONSTRUCTION. REVIEW OF TRANSPORT ECONOMICS AND MANAGEMENT. 2026:343-348. doi:10.15802/rtem2026/359505
BibTeX
@article{PODKOPAIEV2026,
author = {PODKOPAIEV, D.S.},
title = {ADAPTIVE SYSTEM OF INDICATORS FOR MONITORING THE ECONOMIC EFFICIENCY OF BUSINESS PROCESS AUTOMATION IN CONSTRUCTION},
journal = {REVIEW OF TRANSPORT ECONOMICS AND MANAGEMENT},
year = {2026},
number = {15(31)},
pages = {343--348},
doi = {10.15802/rtem2026/359505}
}
EUVIMED