EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Time-dependent behaviors of bolted beam-to-beam precast concrete connections

Wael Hameedi, István Völgyi

Pollack Periodica · 09.06.2026

DOI: 10.1556/606.2026.01610 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Pollack Periodica, erschienen am 09.06.2026. Verfasst von Wael Hameedi und 1 weiteren Autor:innen. Die Arbeit nennt 38 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper investigates the creep behavior of bolted beam-to-beam precast concrete connections. The goals of the study are to evaluate how the hybrid joint assembly imperfections influence the load-separation response under sustained loading. Four specimens of two sizes and imperfection levels were loaded for 60 days, followed by reloading to failure to assess changes in stiffness, yield, and capacity. Results showed that the joint size and imperfections do not significantly affect the load-separation response. Compared to the short-term loaded specimens, long-term loading reduces the initial stiffness up to 26.8%, but yield and peak load capacity remain unaffected. A validated finite element model closely matched the experimental results.

Zitieren

APA

Hameedi, W., & Völgyi, I. (2026). Time-dependent behaviors of bolted beam-to-beam precast concrete connections. Pollack Periodica. https://doi.org/10.1556/606.2026.01610

Vancouver

Hameedi W, Völgyi I. Time-dependent behaviors of bolted beam-to-beam precast concrete connections. Pollack Periodica. 2026. doi:10.1556/606.2026.01610

BibTeX
@article{Hameedi2026,
  author = {Hameedi, Wael and Völgyi, István},
  title = {Time-dependent behaviors of bolted beam-to-beam precast concrete connections},
  journal = {Pollack Periodica},
  year = {2026},
  doi = {10.1556/606.2026.01610}
}
Kostenlos starten →