EUVIMEDEUVIMED entdecken
Crossref

Project Spotlight: Multicomponent wall system meets medical building design and deadline requirements

Stephanie Johnston

PCI Journal · 2026 · 71 (4) · 14-14

DOI: 10.15554/pcij71.4-ps2 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PCI Journal, 2026. Verfasst von Stephanie Johnston.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Building the Pine Rest Pediatric Center of Behavioral Health in Grand Rapids, Mich., with 365 insulated precast concrete wall panels that alternate embedded brick with acid wash and formliner finish saved project stakeholders time and money. Fabcon Precast was the PCI-certified precast concrete producer and erector

Zitieren

APA

Johnston, S. (2026). Project Spotlight: Multicomponent wall system meets medical building design and deadline requirements. PCI Journal, 71(4), 14-14. https://doi.org/10.15554/pcij71.4-ps2

Vancouver

Johnston S. Project Spotlight: Multicomponent wall system meets medical building design and deadline requirements. PCI Journal. 2026;71(4):14-14. doi:10.15554/pcij71.4-ps2

BibTeX
@article{Johnston2026,
  author = {Johnston, Stephanie},
  title = {Project Spotlight: Multicomponent wall system meets medical building design and deadline requirements},
  journal = {PCI Journal},
  year = {2026},
  volume = {71},
  number = {4},
  pages = {14--14},
  doi = {10.15554/pcij71.4-ps2}
}
Kostenlos starten →