Crossref
Creation of an Equation for Determining the Interrepair Time of Operation of Boom Cranes Based on the Theory of Continuous Damage
METALLOFIZIKA I NOVEISHIE TEKHNOLOGII · 26.02.2026
DOI: 10.15407/mfint.48.02.0205 ↗Kurz gefasst
Fachartikel in der Zeitschrift METALLOFIZIKA I NOVEISHIE TEKHNOLOGII, online erschienen am 26.02.2026. Die Arbeit nennt 16 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
(2026). Creation of an Equation for Determining the Interrepair Time of Operation of Boom Cranes Based on the Theory of Continuous Damage. METALLOFIZIKA I NOVEISHIE TEKHNOLOGII. https://doi.org/10.15407/mfint.48.02.0205
Vancouver
Creation of an Equation for Determining the Interrepair Time of Operation of Boom Cranes Based on the Theory of Continuous Damage. METALLOFIZIKA I NOVEISHIE TEKHNOLOGII. 2026. doi:10.15407/mfint.48.02.0205
BibTeX
@article{euvimed2026,
title = {Creation of an Equation for Determining the Interrepair Time of Operation of Boom Cranes Based on the Theory of Continuous Damage},
journal = {METALLOFIZIKA I NOVEISHIE TEKHNOLOGII},
year = {2026},
doi = {10.15407/mfint.48.02.0205}
}
EUVIMED