EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

Adebayo Wahab Salami, Bolaji Fatai Sule, Tope Lacroix Adunkpe, Ayanniyi Mufutau Ayanshola, Solomon Olakunle Bilewu

Slovak Journal of Civil Engineering · 01.03.2017 · 25 (1) · 1-9

DOI: 10.1515/sjce-2017-0001 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Slovak Journal of Civil Engineering, online erschienen am 01.04.2017. Verfasst von Adebayo Wahab Salami und 4 weiteren Autor:innen. Die Arbeit wurde bisher 5-mal zitiert (Crossref) und nennt 17 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir’s live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.

Zitieren

APA

Salami, A. W., Sule, B. F., Adunkpe, T. L., Ayanshola, A. M., & Bilewu, S. O. (2017). Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria. Slovak Journal of Civil Engineering, 25(1), 1-9. https://doi.org/10.1515/sjce-2017-0001

Vancouver

Salami AW, Sule BF, Adunkpe TL, Ayanshola AM, Bilewu SO. Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria. Slovak Journal of Civil Engineering. 2017;25(1):1-9. doi:10.1515/sjce-2017-0001

BibTeX
@article{Salami2017,
  author = {Salami, Adebayo Wahab and Sule, Bolaji Fatai and Adunkpe, Tope Lacroix and Ayanshola, Ayanniyi Mufutau and Bilewu, Solomon Olakunle},
  title = {Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria},
  journal = {Slovak Journal of Civil Engineering},
  year = {2017},
  volume = {25},
  number = {1},
  pages = {1--9},
  doi = {10.1515/sjce-2017-0001}
}
Kostenlos starten →