Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India

K. Chandrashekhar Iyer, Partha S. Banerjee

Organization, Technology and Management in Construction: an International Journal · 2016

DOI: 10.1515/otmcj-2016-0012 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Organization, Technology and Management in Construction: an International Journal, 2016. Verfasst von K. Chandrashekhar Iyer und 1 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 58 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Planning deficiencies and consequent execution delays are likely to persist in infrastructure development projects. However, recovery of schedule delay is a less researched area. This case research, using a two-stage inquiry modeled on the grounded theory, studied the schedule delay recovery during the execution phase of a brownfield airport construction project. The analyses generated contextual evidence and ambidexterity was found to be the key underlying phenomenon for successful recovery measures. The empirical learning was validated with literature and can be used by practitioners looking to institute schedule recovery measures.

Zitieren

APA

Iyer, K. C., & Banerjee, P. S. (2016). Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India. Organization, Technology and Management in Construction: an International Journal. https://doi.org/10.1515/otmcj-2016-0012

Vancouver

Iyer KC, Banerjee PS. Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India. Organization, Technology and Management in Construction: an International Journal. 2016. doi:10.1515/otmcj-2016-0012

BibTeX
@article{Iyer2016,
  author = {Iyer, K. Chandrashekhar and Banerjee, Partha S.},
  title = {Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India},
  journal = {Organization, Technology and Management in Construction: an International Journal},
  year = {2016},
  doi = {10.1515/otmcj-2016-0012}
}
Kostenlos starten →