EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Optimisation of Building’s Construction Costs and CO 2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London

Weronika Lechowska

Architecture and Urban Planning · 2015

DOI: 10.1515/aup-2015-0002 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Architecture and Urban Planning, 2015. Verfasst von Weronika Lechowska. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The results of the building optimisation presented in this article come from the author’s entry project in the Design Optimisation Competition 2014. Simulations were conducted to help to design an office building and to minimise its costs and impact on the environment. Ultimately, the building’s construction costs were reduced to £2,294,216 and annual CO 2 production to 136,169.3 kg, while maintaining discomfort hours below 200 hours per year and daylight floor area above threshold on the level of 60.0 %.

Zitieren

APA

Lechowska, W. (2015). Optimisation of Building’s Construction Costs and CO 2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London. Architecture and Urban Planning. https://doi.org/10.1515/aup-2015-0002

Vancouver

Lechowska W. Optimisation of Building’s Construction Costs and CO 2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London. Architecture and Urban Planning. 2015. doi:10.1515/aup-2015-0002

BibTeX
@article{Lechowska2015,
  author = {Lechowska, Weronika},
  title = {Optimisation of Building’s Construction Costs and CO 2 Emission Based on the Computer Model of a Theoretical Office Building Located Near London},
  journal = {Architecture and Urban Planning},
  year = {2015},
  doi = {10.1515/aup-2015-0002}
}
Kostenlos starten →