Real-time optimal scheduling framework for construction machinery multi machine collaborative work combining federated learning and edge computing

Wubin Xie

International Journal of Reasoning-based Intelligent Systems · 2026 · 18 (30) · 44-56

DOI: 10.1504/ijris.2026.157621 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Reasoning-based Intelligent Systems, 2026. Verfasst von Wubin Xie.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Xie, W. (2026). Real-time optimal scheduling framework for construction machinery multi machine collaborative work combining federated learning and edge computing. International Journal of Reasoning-based Intelligent Systems, 18(30), 44-56. https://doi.org/10.1504/ijris.2026.157621

Vancouver

Xie W. Real-time optimal scheduling framework for construction machinery multi machine collaborative work combining federated learning and edge computing. International Journal of Reasoning-based Intelligent Systems. 2026;18(30):44-56. doi:10.1504/ijris.2026.157621

BibTeX
@article{Xie2026,
  author = {Xie, Wubin},
  title = {Real-time optimal scheduling framework for construction machinery multi machine collaborative work combining federated learning and edge computing},
  journal = {International Journal of Reasoning-based Intelligent Systems},
  year = {2026},
  volume = {18},
  number = {30},
  pages = {44--56},
  doi = {10.1504/ijris.2026.157621}
}
Kostenlos starten →