Crossref
Scheduling of Industrial Projects under Uncertainty Using the GM(1,1) Model and the GERT Technique
International Journal of Operational Research · 2026 · 1 (1)
DOI: 10.1504/ijor.2026.10079910 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Operational Research, 2026. Verfasst von Wakas Khalaf und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Khalaf, W., & Muhammad, E. S. (2026). Scheduling of Industrial Projects under Uncertainty Using the GM(1,1) Model and the GERT Technique. International Journal of Operational Research, 1(1). https://doi.org/10.1504/ijor.2026.10079910
Vancouver
Khalaf W, Muhammad ES. Scheduling of Industrial Projects under Uncertainty Using the GM(1,1) Model and the GERT Technique. International Journal of Operational Research. 2026;1(1). doi:10.1504/ijor.2026.10079910
BibTeX
@article{Khalaf2026,
author = {Khalaf, Wakas and Muhammad, Enas Salahuddin},
title = {Scheduling of Industrial Projects under Uncertainty Using the GM(1,1) Model and the GERT Technique},
journal = {International Journal of Operational Research},
year = {2026},
volume = {1},
number = {1},
doi = {10.1504/ijor.2026.10079910}
}
EUVIMED