Crossref
The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness
International Journal of Operational Research · 2017 · 28 (1) · 70
DOI: 10.1504/ijor.2017.080596 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Operational Research, 2017. Verfasst von Imen Hamdi und 1 weiteren Autor:innen. Die Arbeit wurde bisher 7-mal zitiert (Crossref).
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Hamdi, I., & Loukil, T. (2017). The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness. International Journal of Operational Research, 28(1), 70. https://doi.org/10.1504/ijor.2017.080596
Vancouver
Hamdi I, Loukil T. The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness. International Journal of Operational Research. 2017;28(1):70. doi:10.1504/ijor.2017.080596
BibTeX
@article{Hamdi2017,
author = {Hamdi, Imen and Loukil, Taïcir},
title = {The permutation flowshop scheduling problem with exact time lags to minimise the total earliness and tardiness},
journal = {International Journal of Operational Research},
year = {2017},
volume = {28},
number = {1},
pages = {70},
doi = {10.1504/ijor.2017.080596}
}
EUVIMED