EUVIMEDEUVIMED entdecken
Crossref

Role of adaptive project method in turnkey construction projects

Drisya Murali, Aswathy Sreenivasan, M. Suresh

International Journal of Indian Culture and Business Management · 2026 · 37 (3) · 316-332

DOI: 10.1504/ijicbm.2026.152305 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Indian Culture and Business Management, 2026. Verfasst von Drisya Murali und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Murali, D., Sreenivasan, A., & Suresh, M. (2026). Role of adaptive project method in turnkey construction projects. International Journal of Indian Culture and Business Management, 37(3), 316-332. https://doi.org/10.1504/ijicbm.2026.152305

Vancouver

Murali D, Sreenivasan A, Suresh M. Role of adaptive project method in turnkey construction projects. International Journal of Indian Culture and Business Management. 2026;37(3):316-332. doi:10.1504/ijicbm.2026.152305

BibTeX
@article{Murali2026,
  author = {Murali, Drisya and Sreenivasan, Aswathy and Suresh, M.},
  title = {Role of adaptive project method in turnkey construction projects},
  journal = {International Journal of Indian Culture and Business Management},
  year = {2026},
  volume = {37},
  number = {3},
  pages = {316--332},
  doi = {10.1504/ijicbm.2026.152305}
}
Kostenlos starten →