Crossref
Reference-point-based GWO algorithm for cutting parallel scheduling problems with bi-criteria objective
European J. of Industrial Engineering · 2026 · 22 (1)
DOI: 10.1504/ejie.2026.10079962 ↗Kurz gefasst
Fachartikel in der Zeitschrift European J. of Industrial Engineering, 2026. Verfasst von Ronghua Meng und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Meng, R., Rao, Y., Wu, Z., & Xu, X. (2026). Reference-point-based GWO algorithm for cutting parallel scheduling problems with bi-criteria objective. European J. of Industrial Engineering, 22(1). https://doi.org/10.1504/ejie.2026.10079962
Vancouver
Meng R, Rao Y, Wu Z, Xu X. Reference-point-based GWO algorithm for cutting parallel scheduling problems with bi-criteria objective. European J. of Industrial Engineering. 2026;22(1). doi:10.1504/ejie.2026.10079962
BibTeX
@article{Meng2026,
author = {Meng, Ronghua and Rao, Yunqing and Wu, Zhengjia and Xu, Xiaofei},
title = {Reference-point-based GWO algorithm for cutting parallel scheduling problems with bi-criteria objective},
journal = {European J. of Industrial Engineering},
year = {2026},
volume = {22},
number = {1},
doi = {10.1504/ejie.2026.10079962}
}
EUVIMED