Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method
Advances in Production Engineering & Management · 30.09.2019 · 14 (3) · 271-283
DOI: 10.14743/apem2019.3.327 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances in Production Engineering & Management, online erschienen am 30.09.2019. Verfasst von C. Jiang und 1 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref).
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Jiang, C., & Xi, J. (2019). Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method. Advances in Production Engineering & Management, 14(3), 271-283. https://doi.org/10.14743/apem2019.3.327
Vancouver
Jiang C, Xi J. Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method. Advances in Production Engineering & Management. 2019;14(3):271-283. doi:10.14743/apem2019.3.327
BibTeX
@article{Jiang2019,
author = {Jiang, C. and Xi, J.T.},
title = {Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method},
journal = {Advances in Production Engineering & Management},
year = {2019},
volume = {14},
number = {3},
pages = {271--283},
doi = {10.14743/apem2019.3.327}
}
EUVIMED