Change Management on Large Multi-location ERP Projects

Josip Nađ

European Journal of Applied Sciences · 11.11.2026 · 14 (06) · 62-77

DOI: 10.14738/ejas.1406.12617 ↗

Kurz gefasst

Fachartikel in der Zeitschrift European Journal of Applied Sciences, online erschienen am 11.11.2026. Verfasst von Josip Nađ. Die Arbeit nennt 5 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Large manufacturing companies that implement a unique integrated business ERP (Enterprise Resource Planning) system, simultaneously at a large number of geographically distributed production locations within a single legal entity, face a challenge of exceptional complexity. The difficulty is further increased when these locations operated with separate, locally adapted ERP systems, so employees, in addition to having to learn to use a new tool, also have to fundamentally change their way of thinking about business processes, data location and responsibility for results. Relying on the available literature, project experience and two published case studies [1, 2], this paper synthesizes the key principles of effective change management, analyses the psychological impact of ERP implementation on employees and identifies seven critical risk factors that determine the success or failure of such projects. For each risk factor and for the broader framework of change management, practical recommendations are provided, and at the end, an overview of final tips for managing change in this type of project is provided.

Zitieren

APA

Nađ, J. (2026). Change Management on Large Multi-location ERP Projects. European Journal of Applied Sciences, 14(06), 62-77. https://doi.org/10.14738/ejas.1406.12617

Vancouver

Nađ J. Change Management on Large Multi-location ERP Projects. European Journal of Applied Sciences. 2026;14(06):62-77. doi:10.14738/ejas.1406.12617

BibTeX
@article{Na2026,
  author = {Nađ, Josip},
  title = {Change Management on Large Multi-location ERP Projects},
  journal = {European Journal of Applied Sciences},
  year = {2026},
  volume = {14},
  number = {06},
  pages = {62--77},
  doi = {10.14738/ejas.1406.12617}
}
Kostenlos starten →