Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries
Jurnal Sistem Informasi Bisnis · 2025
DOI: 10.14710/vol15iss2pp152-158 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Sistem Informasi Bisnis, 2025. Verfasst von Achmad Fawwaz Bahaudin und 2 weiteren Autor:innen. Die Arbeit nennt 13 Literaturangaben.
Abstract (Originalsprache)
The bi-criteria objective scheduling is essential in the Jepara furniture industry due to its competitiveness. Scheduling that not only considers the company's profits but also takes into account the customer's perspective can add significant value to the company. Based on that, this paper proposed a mathematical model for the furniture finishing industry. Then it transformed into a Microsoft Excel Solver model. Cost calculation is also considered to choose the best model. The system's characteristic is flexible flow shop production, not identical at the last stage, and sequence-dependent set up time. The objective of scheduling is to minimize total maximum completion time and total weighted tardiness. There are 3 scenarios in this paper, company focused, customer, and bi-criteria objective. After running the model, scenario 3 is the best choice for completing priority orders on time, while scenario 1 is ideal when seeking efficiency in production with delays being less of a concern.
Zitieren
APA
Bahaudin, A. F., Susanty, A., & Saptadi, S. (2025). Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries. Jurnal Sistem Informasi Bisnis. https://doi.org/10.14710/vol15iss2pp152-158
Vancouver
Bahaudin AF, Susanty A, Saptadi S. Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries. Jurnal Sistem Informasi Bisnis. 2025. doi:10.14710/vol15iss2pp152-158
BibTeX
@article{Bahaudin2025,
author = {Bahaudin, Achmad Fawwaz and Susanty, Aries and Saptadi, Singgih},
title = {Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries},
journal = {Jurnal Sistem Informasi Bisnis},
year = {2025},
doi = {10.14710/vol15iss2pp152-158}
}
EUVIMED