Design and implementation of project milestone control software based on the synthesis of standard requirements and analysis of existing solutions

Aleksandr A. Davydov, Elizaveta A. Skorniakova

Vestnik of Samara State Technical University. Technical Sciences Series · 28.04.2026 · 34 (1) · 38-52

DOI: 10.14498/tech.2026.1.3 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Vestnik of Samara State Technical University. Technical Sciences Series, online erschienen am 28.04.2026. Verfasst von Aleksandr A. Davydov und 1 weiteren Autor:innen. Die Arbeit nennt 14 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Modern challenges in project management, such as hybrid work formats and virtualization, necessitate new control tools based on fundamental practices, including milestone management. However, existing international and domestic standards (GOST R 54869-2011, GOST R ISO 21502-2024, GOST R 56714.2-2015) establish control requirements but do not detail monitoring procedures, which creates an opportunity for their software interpretation and automation. A comparative analysis of the functional capabilities of widespread project management systems (Jira, Asana, Microsoft Project, ClickUp) revealed a significant methodological gap: in these products, a milestone is represented as a calendar marker, which does not reflect its essence as a checkpoint for recording the completion of a stage. This precludes its use as a structural container for the strict attachment of a mandatory package of supporting documentation and does not support the automated generation of consolidated reports on the status of acceptance criteria fulfillment for each control point. This functional deficiency necessitates labor-intensive manual operations for aggregating data from heterogeneous sources, which reduces control efficiency, increases error risks, and directly affects the manageability of complex, especially regulated and innovative, projects. In response to the identified problem, the article substantiates the architecture and presents the development results of the specialized cross-platform software "Milestones Controller," built on C++/Qt. The solution is based on UML models (use case, activity, and sequence diagrams) that describe the interaction processes between the administrator and employees. The program enables real-time monitoring of document statuses across project areas, generates summary reports, and stores all project documentation in a single secure space. This eliminates the identified shortcomings of existing analogues, reduces labor costs, and enhances the transparency of milestone-based project management.

Zitieren

APA

Davydov, A. A., & Skorniakova, E. A. (2026). Design and implementation of project milestone control software based on the synthesis of standard requirements and analysis of existing solutions. Vestnik of Samara State Technical University. Technical Sciences Series, 34(1), 38-52. https://doi.org/10.14498/tech.2026.1.3

Vancouver

Davydov AA, Skorniakova EA. Design and implementation of project milestone control software based on the synthesis of standard requirements and analysis of existing solutions. Vestnik of Samara State Technical University. Technical Sciences Series. 2026;34(1):38-52. doi:10.14498/tech.2026.1.3

BibTeX
@article{Davydov2026,
  author = {Davydov, Aleksandr A. and Skorniakova, Elizaveta A.},
  title = {Design and implementation of project milestone control software based on the synthesis of standard requirements and analysis of existing solutions},
  journal = {Vestnik of Samara State Technical University. Technical Sciences Series},
  year = {2026},
  volume = {34},
  number = {1},
  pages = {38--52},
  doi = {10.14498/tech.2026.1.3}
}
Kostenlos starten →