Crossref
Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation
Journal of New Materials for Electrochemical Systems · 11.04.2026 · 28 (4)
DOI: 10.14447/jnmes/v28i4.a08 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of New Materials for Electrochemical Systems, online erschienen am 11.04.2026.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
(2026). Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation. Journal of New Materials for Electrochemical Systems, 28(4). https://doi.org/10.14447/jnmes/v28i4.a08
Vancouver
Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation. Journal of New Materials for Electrochemical Systems. 2026;28(4). doi:10.14447/jnmes/v28i4.a08
BibTeX
@article{euvimed2026,
title = {Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation},
journal = {Journal of New Materials for Electrochemical Systems},
year = {2026},
volume = {28},
number = {4},
doi = {10.14447/jnmes/v28i4.a08}
}
EUVIMED