EUVIMEDEUVIMED entdecken
Crossref

Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation

Journal of New Materials for Electrochemical Systems · 11.04.2026 · 28 (4)

DOI: 10.14447/jnmes/v28i4.a08 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of New Materials for Electrochemical Systems, online erschienen am 11.04.2026.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

(2026). Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation. Journal of New Materials for Electrochemical Systems, 28(4). https://doi.org/10.14447/jnmes/v28i4.a08

Vancouver

Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation. Journal of New Materials for Electrochemical Systems. 2026;28(4). doi:10.14447/jnmes/v28i4.a08

BibTeX
@article{euvimed2026,
  title = {Integrating the GQM Model to Evaluate the Effect of Project Delay on Software Industry Project Cost Estimation},
  journal = {Journal of New Materials for Electrochemical Systems},
  year = {2026},
  volume = {28},
  number = {4},
  doi = {10.14447/jnmes/v28i4.a08}
}
Kostenlos starten →