The use of Plan-Do-Study-Act (PDSA) cycle in perfection of fracture liaison service work
Osteoporosis and Bone Diseases · 2020
DOI: 10.14341/osteo10272 ↗Kurz gefasst
Fachartikel in der Zeitschrift Osteoporosis and Bone Diseases, 2020. Verfasst von Ksenia Y. Belova und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 1 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
Background
Secondary fracture prevention services (FLS) have been established around the world during several last years. However, due to the differences of medical care organization in different regions, it is difficult to offer a unified approach of the structure and separate components of such services, which could be used everywhere. It is recommended to apply the Plan-Do-Study-Act (PDSA) cycle to evaluate the FLS in the institution.
Aim
To study the application of the PDSA cycle in the optimization of FLS working in Yaroslavl. Materials and methods: We evaluated the effectiveness of FLS organization which was created in the Emergency medical care hospital n.a. N. V. Solovyov at two stages of its development: at the first stage we worked using the principle by referral of a traumatologist, at the second stage we used a dedicated coordinator. We used the questionnaire Best Practice framework for assessment. We also used PDSA cycle to analyze and evaluate the effectiveness of FLS organization.
Results
At the stage by referral of a traumatologist we revealed problems with patients identification, timing of assessment after a fracture, low frequency of initiation of osteoporosis therapy, lack of a falls prevention system and problems with a database. After the analysis and revealing shortcomings weve made several changes in the organization of our FLS. First of all we introduced a dedicated coordinator-nurse in the staff of FLS.The following analysis showed that significant improvements had been made in all revealed directions. The following application of the PDSA cycle again identified several issues of FLS organization requiring improvement.
Conclusion
Thus, the use of the PDSA cycle during the organization of FLS is a tool of effective control and establishment of an effective care system for patients with low-energy fractures.
Zitieren
APA
Belova, K. Y., & Ershova, O. B. (2020). The use of Plan-Do-Study-Act (PDSA) cycle in perfection of fracture liaison service work. Osteoporosis and Bone Diseases. https://doi.org/10.14341/osteo10272
Vancouver
Belova KY, Ershova OB. The use of Plan-Do-Study-Act (PDSA) cycle in perfection of fracture liaison service work. Osteoporosis and Bone Diseases. 2020. doi:10.14341/osteo10272
BibTeX
@article{Belova2020,
author = {Belova, Ksenia Y. and Ershova, Olga B.},
title = {The use of Plan-Do-Study-Act (PDSA) cycle in perfection of fracture liaison service work},
journal = {Osteoporosis and Bone Diseases},
year = {2020},
doi = {10.14341/osteo10272}
}
EUVIMED