Maintenance Case Study of Pedestrian Cable-Stayed Bridge with Sparse Cable System
Stavební obzor - Civil Engineering Journal · 31.07.2026 · 35 (2) · 190-204
DOI: 10.14311/cej.2026.02.0013 ↗Kurz gefasst
Fachartikel in der Zeitschrift Stavební obzor - Civil Engineering Journal, online erschienen am 31.07.2026. Verfasst von Dandan Hu und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
The cable-stayed Bridges built in the early days have some hidden dangers due to the corrosion of the cable and the looseness of the anchor. In this paper, the control process of cable replacement of pedestrian cable-stayed bridge is analyzed, the characteristics of different construction parameters in different construction stages are discussed, and the theoretical cable force value is compared with the measured cable force value by the finite element method. The results show that the error between the measured cable force and the theoretical cable force is within 2% of the standard requirement. The linear shape of the main beam has been greatly improved, with a maximum elevation of 4.9 cm, making pedestrians travel more comfortable. The maximum offset value of the main tower is 1.3 mm, which does not exceed the standard requirements when the construction starts and ends, and the cable replacement construction process meets the design requirements. Received: 05.12.2025 Received in revised form: 02.07.2026 Accepted: 14.07.2026
Zitieren
APA
Hu, D., Wang, Y., & Yan, B. (2026). Maintenance Case Study of Pedestrian Cable-Stayed Bridge with Sparse Cable System. Stavební obzor - Civil Engineering Journal, 35(2), 190-204. https://doi.org/10.14311/cej.2026.02.0013
Vancouver
Hu D, Wang Y, Yan B. Maintenance Case Study of Pedestrian Cable-Stayed Bridge with Sparse Cable System. Stavební obzor - Civil Engineering Journal. 2026;35(2):190-204. doi:10.14311/cej.2026.02.0013
BibTeX
@article{Hu2026,
author = {Hu, Dandan and Wang, Yu and Yan, Baozhen},
title = {Maintenance Case Study of Pedestrian Cable-Stayed Bridge with Sparse Cable System},
journal = {Stavební obzor - Civil Engineering Journal},
year = {2026},
volume = {35},
number = {2},
pages = {190--204},
doi = {10.14311/cej.2026.02.0013}
}
EUVIMED