The use of cost and time in project decision trees: a model and an application
Notas Económicas · 2016
DOI: 10.14195/2183-203x_20_7 ↗Kurz gefasst
Fachartikel in der Zeitschrift Notas Económicas, 2016. Verfasst von Pedro Cortesão Godinho und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
In this paper we present a useful bicriteria model for project analysis based on decision trees, and an application of the model to a production planning problem. We start by presenting a model that allows the use of time and cost in project analysis. This model is easy to use, and it can be applied to a large number of real-life situations when the main objectives are the minimisation of cost and the minimisation of time. The construction of the decision trees for this model may require large computational times, and thus become impracticable. We deal with this problem in two ways: first, we define an algorithm for generating the strategies, and then we introduce an error parameter, which allows us to avoid generating all the strategies that are very close to each other. Finally, we apply the model to a production planning problem. We define the problem, use the algorithm to identify the efficient strategies and analyse the results.
Zitieren
APA
Godinho, P. C., & Costa, J. P. (2016). The use of cost and time in project decision trees: a model and an application. Notas Económicas. https://doi.org/10.14195/2183-203x_20_7
Vancouver
Godinho PC, Costa JP. The use of cost and time in project decision trees: a model and an application. Notas Económicas. 2016. doi:10.14195/2183-203x_20_7
BibTeX
@article{Godinho2016,
author = {Godinho, Pedro Cortesão and Costa, João Paulo},
title = {The use of cost and time in project decision trees: a model and an application},
journal = {Notas Económicas},
year = {2016},
doi = {10.14195/2183-203x_20_7}
}
EUVIMED