EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project

Mohammad Senisel Bachari iD, Asgar Khademvatani iD, Mahdi Iranfar

PLOS One · 2026

DOI: 10.1371/journal.pone.0357560 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS One, 2026. Verfasst von Mohammad Senisel Bachari und 2 weiteren Autor:innen. Beteiligte Einrichtung: Department of Energy Economics and Management, Tehran Faculty of Petroleum, Petroleum University of Technology, Tehran, Iran. Hauptthemen laut MEDLINE: Fuzzy Logic, Petroleum, Decision Making, Programming, Linear. Die Arbeit nennt 82 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Effective project risk management helps to reduce negative outcomes, especially in construction projects. Because project risk management involves many different parts, an integrated approach is needed to cover all phases. This study proposes an integrated framework for risk planning, identification, assessment, and response strategy selection, addressing major weaknesses in traditional risk management methods. The framework systematically identifies risks, their characteristics, and their impact zones. These elements help to evaluate each risk thoroughly. Risk assessment is performed using fuzzy multi-criteria decision-making, fuzzy SWARA (Step-wise Weight Assessment Ratio Analysis) and fuzzy WSM (Weighted Sum Model). The selection of risk response strategies is then formulated as a mixed integer linear programming (MILP) optimization model. This produces an optimal risk response strategy that reduces threats and takes advantage of opportunities. To provide a proof-of-concept illustration of the proposed integrated framework, we present a case study utilizing empirical data from a real‑world liquefied petroleum gas (LPG) pipeline construction project. The findings identify 20 distinct risks and 12 viable risk response strategies. The optimization component successfully selects six out of twelve response strategies. This achieves a 38.9% reduction in total risk value while meeting the project’s constraints.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Fuzzy LogicPetroleumDecision MakingProgramming, LinearRisk AssessmentSoft ComputingRisk Management

Substanzen

Petroleum

Autor:innen und Institutionen

  • Department of Energy Economics and Management, Tehran Faculty of Petroleum, Petroleum University of Technology, Tehran, Iran.

ORCID-Profile: Mohammad Senisel Bachari, Asgar Khademvatani

Zitieren

APA

Senisel Bachari, M., Khademvatani, A., & Iranfar, M. (2026). An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project. PLOS One. https://doi.org/10.1371/journal.pone.0357560

Vancouver

Senisel Bachari M, Khademvatani A, Iranfar M. An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project. PLOS One. 2026. doi:10.1371/journal.pone.0357560

BibTeX
@article{SeniselBachari2026,
  author = {Senisel Bachari, Mohammad and Khademvatani, Asgar and Iranfar, Mahdi},
  title = {An integrated fuzzy multi-criteria decision making and mixed-integer linear programming optimization framework for project risk assessment and response strategy selection: A case study of a liquefied petroleum gas pipeline construction project},
  journal = {PLOS One},
  year = {2026},
  doi = {10.1371/journal.pone.0357560}
}
Kostenlos starten →