EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Impact of hydropower availability on resource adequacy of the United States western interconnection

Sai Veena Sunkara iD, Srihari Sundar iD, Gord Stephen iD, Stuart Cohen, Patrick Reed iD, Vivek Srikrishnan iD, Ariel Miara

PLOS One · 23.06.2026 · 21 (6) · e0351321

DOI: 10.1371/journal.pone.0351321 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS One, online erschienen am 23.06.2026. Verfasst von Sai Veena Sunkara und 6 weiteren Autor:innen. Beteiligte Einrichtung: School of Civil and Environmental Engineering, Cornell University, Ithaca, New York, United States of America. Hauptthemen laut MEDLINE: Power Plants. Die Arbeit nennt 53 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: U.S. Department of Energy Office of Critical Minerals and Energy Innovation Hydropower and Hydrokinetic office.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Hydropower is a key energy source in the western interconnection of the United States, comprising about 25% of the annual installed nameplate capacity in 2020. However, its generation is increasingly impacted by changing hydrological conditions, operational constraints, environmental factors, water availability, and aging dam infrastructure. Assessing hydropower availability and resource adequacy is valuable for shaping energy policies and infrastructure requirements. In this study we evaluate the sensitivity of resource adequacy in the Western Interconnection to the unavailability of hydropower plants, under a wide-ranging set of 16,384 hydropower loss scenarios derived from a combination of 14 major hydrologic regions. Although a complete loss of hydropower capacity in any region is unlikely, studying such scenarios helps in identifying hydrologic regions most critical for maintaining resource adequacy. So, we identify key hydrologic regions with disproportionately large adequacy impacts relative to their installed hydropower capacity and study compounding effects between regions using classification and regression trees. Even after controlling for total installed capacity, we find that hydropower resources in the Pacific Northwest contribute the most to interconnection-wide adequacy outcomes, with resources in Northern California and the Desert Southwest providing more moderate incremental contributions.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Power PlantsUnited StatesHydrology

Autor:innen und Institutionen

  • School of Civil and Environmental Engineering, Cornell University, Ithaca, New York, United States of America.
  • Grid Planning and Analysis Center, National Laboratory of the Rockies, Golden, Colorado, United States of America.
  • Department of Biological and Environmental Engineering, Cornell University, Ithaca, New York, United States of America.

ORCID-Profile: Sai Veena Sunkara, Srihari Sundar, Gord Stephen, Patrick Reed, Vivek Srikrishnan

Förderung

  • U.S. Department of Energy Office of Critical Minerals and Energy Innovation Hydropower and Hydrokinetic office

Zitieren

APA

Sunkara, S. V., Sundar, S., Stephen, G., Cohen, S., Reed, P., Srikrishnan, V., & Miara, A. (2026). Impact of hydropower availability on resource adequacy of the United States western interconnection. PLOS One, 21(6), e0351321. https://doi.org/10.1371/journal.pone.0351321

Vancouver

Sunkara SV, Sundar S, Stephen G, Cohen S, Reed P, Srikrishnan V, et al. Impact of hydropower availability on resource adequacy of the United States western interconnection. PLOS One. 2026;21(6):e0351321. doi:10.1371/journal.pone.0351321

BibTeX
@article{Sunkara2026,
  author = {Sunkara, Sai Veena and Sundar, Srihari and Stephen, Gord and Cohen, Stuart and Reed, Patrick and Srikrishnan, Vivek and Miara, Ariel},
  title = {Impact of hydropower availability on resource adequacy of the United States western interconnection},
  journal = {PLOS One},
  year = {2026},
  volume = {21},
  number = {6},
  pages = {e0351321},
  doi = {10.1371/journal.pone.0351321}
}
Kostenlos starten →