Critical risk identification in construction projects using 2D and 3D risk matrices

Shamal Ali Othman iD, Dalshad Kakasor Ismael Jaff, Ahmet Öztaş

PLOS One · 05.03.2026 · 21 (3) · e0344476

DOI: 10.1371/journal.pone.0344476 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS One, online erschienen am 05.03.2026. Verfasst von Shamal Ali Othman und 2 weiteren Autor:innen. Beteiligte Einrichtung: Department of Civil Engineering, College of Engineering, Salahaddin University-Erbil, Erbil, Kurdistan Region, Iraq. Hauptthemen laut MEDLINE: Construction Industry. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 47 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects are exposed to numerous risks that may adversely affect project cost and duration. The purpose of this study is to identify and prioritize key construction risks by combining a Work Breakdown Structure (WBS) with a Risk Breakdown Structure (RBS) and analyzing these risks using two-dimensional (2D) and three-dimensional (3D) risk matrices. In total, 63 risk factors were identified and categorized into five main areas of the work breakdown structure: earthwork, concrete, finishing, mechanical, and electrical. The questionnaire was designed based on each risk category and then sent to engineers, who were asked to estimate the risk probability and its impact. In total, 378 engineers responded. The respondents data were analyzed by using the risk matrix method. Two separate 3D risk matrices were made: one was based on multiplying all three data points, and the other was based on combining both impacts. The results clearly show that the 3D matrix, which combines cost and time impact, yields more accurate results than the matrix that multiplies cost impact and time impact.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Construction IndustryHumansRisk AssessmentConstruction MaterialsSurveys and QuestionnairesRisk Factors

Autor:innen und Institutionen

  • Department of Civil Engineering, College of Engineering, Salahaddin University-Erbil, Erbil, Kurdistan Region, Iraq.
  • Department of Civil Engineering, Epoka University, Tirana, Albania.

ORCID-Profile: Shamal Ali Othman

Zitieren

APA

Othman, S. A., Jaff, D. K. I., & Öztaş, A. (2026). Critical risk identification in construction projects using 2D and 3D risk matrices. PLOS One, 21(3), e0344476. https://doi.org/10.1371/journal.pone.0344476

Vancouver

Othman SA, Jaff DKI, Öztaş A. Critical risk identification in construction projects using 2D and 3D risk matrices. PLOS One. 2026;21(3):e0344476. doi:10.1371/journal.pone.0344476

BibTeX
@article{Othman2026,
  author = {Othman, Shamal Ali and Jaff, Dalshad Kakasor Ismael and Öztaş, Ahmet},
  title = {Critical risk identification in construction projects using 2D and 3D risk matrices},
  journal = {PLOS One},
  year = {2026},
  volume = {21},
  number = {3},
  pages = {e0344476},
  doi = {10.1371/journal.pone.0344476}
}