Application of the DEMATEL method for quantitative analysis of risk factors for railway investments in Poland

Jan Kowalski, Marzena Lendo-Siwicka iD, Zdzisław Skutnik iD, Dorota Mirosław-Świątek

PLOS ONE · 2024

DOI: 10.1371/journal.pone.0303606 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS ONE, 2024. Verfasst von Jan Kowalski und 3 weiteren Autor:innen. Beteiligte Einrichtung: Institute of Civil Engineering, Warsaw University of Life Sciences-SGGW, Warsaw, Poland. Hauptthemen laut MEDLINE: Railroads, Investments. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 41 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The paper presents the results of research on the influence of risk factors on the implementation of railway investments in Poland (build stage) and deals with a detailed diagnosis of relation between factors. The application of DEcision MAking Trial and Evaluation Laboratory (DEMATEL) method for the analyses allowed to develop a cause-and-effect model of key factors and analyse the importance of the factors. Eleven factors identified in eariel studies as the most important risk factors were examined. It was found that the factors: errors in the preparation of tender documents (10.38%), errors in project documentation (10.02%), improperly estimated time of completion of the investment by the Employer (9.82%), internal regulations of PKP Polskie Koleje Państwowe S.A. (Polish State Railways) not coordinated with the provisions of contracts (9.51%) have the highest degree of importance. Factors: too many external institutions involved in the investment process and internal regulations of PKP Polskie Koleje Państwowe S.A. (Polish State Railways) not coordinated with the provisions of contracts, have the greatest net impact on the other factors. The relations between the factors and factors importance are valuable knowledge for engineers, enabling the project to be implemented according to the planned schedule and investment cost.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

RailroadsInvestmentsPolandRisk FactorsHumansDecision Making

Autor:innen und Institutionen

  • Institute of Civil Engineering, Warsaw University of Life Sciences-SGGW, Warsaw, Poland.
  • Institute of Environmental Engineering, Warsaw University of Life Sciences-SGGW, Warsaw, Poland.

ORCID-Profile: Marzena Lendo-Siwicka, Zdzisław Skutnik

Zitieren

APA

Kowalski, J., Lendo-Siwicka, M., Skutnik, Z., & Mirosław-Świątek, D. (2024). Application of the DEMATEL method for quantitative analysis of risk factors for railway investments in Poland. PLOS ONE. https://doi.org/10.1371/journal.pone.0303606

Vancouver

Kowalski J, Lendo-Siwicka M, Skutnik Z, Mirosław-Świątek D. Application of the DEMATEL method for quantitative analysis of risk factors for railway investments in Poland. PLOS ONE. 2024. doi:10.1371/journal.pone.0303606

BibTeX
@article{Kowalski2024,
  author = {Kowalski, Jan and Lendo-Siwicka, Marzena and Skutnik, Zdzisław and Mirosław-Świątek, Dorota},
  title = {Application of the DEMATEL method for quantitative analysis of risk factors for railway investments in Poland},
  journal = {PLOS ONE},
  year = {2024},
  doi = {10.1371/journal.pone.0303606}
}
Kostenlos starten →