EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Optimization of offshore wind farm inspection paths based on K-means-GA

Zhongbo Peng, Shijie Sun iD, Liang Tong, Qiang Fan, Lumeng Wang, Dan Liu

PLOS ONE · 23.05.2024 · 19 (5) · e0303533

DOI: 10.1371/journal.pone.0303533 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS ONE, online erschienen am 23.05.2024. Verfasst von Zhongbo Peng und 5 weiteren Autor:innen. Beteiligte Einrichtung: School of Shipping and Naval Architecture, Chongqing Jiaotong University, Chongqing, China. Hauptthemen laut MEDLINE: Wind, Algorithms. Die Arbeit wurde bisher 9-mal zitiert (Crossref) und nennt 25 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Research and Innovation Project for Graduate Students at Chongqing Jiaotong University, Chongqing Municipal Construction Science and Technology Plan Project.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

As global demand for offshore wind energy continues to rise, the imperative to enhance the profitability of wind power projects and reduce their operational costs becomes increasingly urgent. This study proposes an innovative approach to optimize the inspection routes of offshore wind farms, which integrates the K-means clustering algorithm and genetic algorithm (GA). In this paper, the inspection route planning problem is formulated as a multiple traveling salesman problem (mTSP), and the advantages of the K-means clustering algorithm in distance similarity are utilized to effectively group the positions of wind turbines, thereby optimizing the inspection schedule for vessels. Subsequently, by harnessing the powerful optimization capability and robustness of genetic algorithms, further refinement is conducted to search for the optimal inspection routes, aiming to achieve cost reduction objectives. The results of simulation experiments demonstrate the effectiveness of this integrated approach. Compared to traditional genetic algorithms, the inspection route length has been significantly reduced, from 93 kilometers to 79.36 kilometers. Simultaneously, operational costs have also experienced a notable decrease, dropping from 141,500 Chinese Yuan to 125,600 Chinese Yuan.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

WindAlgorithmsPower PlantsCluster AnalysisComputer Simulation

Autor:innen und Institutionen

  • School of Shipping and Naval Architecture, Chongqing Jiaotong University, Chongqing, China.

ORCID-Profile: Shijie Sun

Förderung

  • Research and Innovation Project for Graduate Students at Chongqing Jiaotong University
  • Chongqing Municipal Construction Science and Technology Plan Project

Zitieren

APA

Peng, Z., Sun, S., Tong, L., Fan, Q., Wang, L., & Liu, D. (2024). Optimization of offshore wind farm inspection paths based on K-means-GA. PLOS ONE, 19(5), e0303533. https://doi.org/10.1371/journal.pone.0303533

Vancouver

Peng Z, Sun S, Tong L, Fan Q, Wang L, Liu D. Optimization of offshore wind farm inspection paths based on K-means-GA. PLOS ONE. 2024;19(5):e0303533. doi:10.1371/journal.pone.0303533

BibTeX
@article{Peng2024,
  author = {Peng, Zhongbo and Sun, Shijie and Tong, Liang and Fan, Qiang and Wang, Lumeng and Liu, Dan},
  title = {Optimization of offshore wind farm inspection paths based on K-means-GA},
  journal = {PLOS ONE},
  year = {2024},
  volume = {19},
  number = {5},
  pages = {e0303533},
  doi = {10.1371/journal.pone.0303533}
}
Kostenlos starten →