EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC 4.0

Life Cycle Cost Analysis of PV-Wind-Battery Hybrid Power System at PLN Nusantara Power Brantas Generation Unit Tulungagung

Alfian Budiarmoko, Heri Suryoatmojo, Feby Agung Pamuji

JAREE (Journal on Advanced Research in Electrical Engineering) · 20.08.2026 · 1 (10)

DOI: 10.12962/jaree.v1i10.550 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JAREE (Journal on Advanced Research in Electrical Engineering), online erschienen am 20.08.2026. Verfasst von Alfian Budiarmoko und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Indonesia faces significant challenges in meeting electricity demand while reducing environmental impacts from fossil fuel-based generation. Hybrid renewable systems, particularly Photovoltaic – Wind – Battery configurations, offer sustainable alternatives for decentralized applications. This study assesses the technical performance and economic feasibility of an existing hybrid system at PLN Nusantara Power UP Brantas, Tulungagung, based on operational data from 2019 to 2025 and projections over a 20-year lifetime. Emphasis is placed on optimizing load utilization to improve cost efficiency. A comprehensive Life Cycle Cost Analysis (LCCA) and HOMER simulation were conducted to determine the total Life Cycle Cost (LCC) and Levelized Cost of Electricity (LCOE). The calculated LCC was Rp1,611 million, with an LCOE of Rp32,939.33/kWh, while HOMER produced a higher LCOE of Rp39,978.62/kWh. This difference results from the calculation method: HOMER uses a fixed annualized Capital Recovery Factor (CRF), while the LCCA discounts each cost individually using a real discount rate. Sensitivity analysis showed that increasing load utilization by 80% reduced surplus energy from 49% to 8%, lowering the LCOE to Rp18,299.63/kWh. Discount rate variations (3 – 7%) affected LCOE between Rp36,103.33 Keywords — and Rp30,273.98/kWh. Meanwhile, ±20% changes in O&M costs led to LCOE shifts between Rp31,047.01 and Rp34,831.66/kWh.

Zitieren

APA

Budiarmoko, A., Suryoatmojo, H., & Pamuji, F. A. (2026). Life Cycle Cost Analysis of PV-Wind-Battery Hybrid Power System at PLN Nusantara Power Brantas Generation Unit Tulungagung. JAREE (Journal on Advanced Research in Electrical Engineering), 1(10). https://doi.org/10.12962/jaree.v1i10.550

Vancouver

Budiarmoko A, Suryoatmojo H, Pamuji FA. Life Cycle Cost Analysis of PV-Wind-Battery Hybrid Power System at PLN Nusantara Power Brantas Generation Unit Tulungagung. JAREE (Journal on Advanced Research in Electrical Engineering). 2026;1(10). doi:10.12962/jaree.v1i10.550

BibTeX
@article{Budiarmoko2026,
  author = {Budiarmoko, Alfian and Suryoatmojo, Heri and Pamuji, Feby Agung},
  title = {Life Cycle Cost Analysis of PV-Wind-Battery Hybrid Power System at PLN Nusantara Power Brantas Generation Unit Tulungagung},
  journal = {JAREE (Journal on Advanced Research in Electrical Engineering)},
  year = {2026},
  volume = {1},
  number = {10},
  doi = {10.12962/jaree.v1i10.550}
}
Kostenlos starten →