EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network

Asiimwe Julius, Pius Erheyovwe Bubu, Elnazeer Ali Hamid Abdalla, Abdullahi Bala Kunya, Val Hyginus Udoka Eze, Mugisha Simon

F1000Research · 17.11.2026 · 15 · 1922

DOI: 10.12688/f1000research.193864.1 ↗

Kurz gefasst

Fachartikel in der Zeitschrift F1000Research, online erschienen am 17.11.2026. Verfasst von Asiimwe Julius und 5 weiteren Autor:innen. Die Arbeit nennt 16 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Background

Rapid demand growth can expose developing transmission systems to corridor overload, voltage deterioration and contingency vulnerability before major reinforcement is completed.

Methods

We evaluated expansion of the 132-kV Western Uganda network using full AC power flow, multi-objective planning, N−1 contingency analysis, demand-growth stress testing and discounted economic assessment.

Results

At 184 MW and 75 MVAr base demand, the existing network lost 2.8767 MW and the Mutundwe–Kabulasoke corridor reached 131.67% loading. A two-circuit plan—Mbarara North–Masaka West and an additional Mutundwe–Kabulasoke circuit—costing USD 117.76 million reduced losses to 1.7261 MW, aggregate voltage deviation from 0.1908 to 0.0974 p.u., and maximum loading to 64.66%. Secure N−1 outcomes improved from 0/12 to 11/14, but two radial-islanding risks and one bulk-entry overload remained. The expanded network met voltage and thermal limits through 120% demand; thermal loading reached 111.7% at 130%. Loss-only discounted benefits produced negative net present value across the tested assumptions.

Conclusions

The results indicate that transmission reinforcement can improve technical performance and contingency security, while a complete investment appraisal also requires monetised reliability, resilience and transfer-capacity benefits.

Zitieren

APA

Julius, A., Bubu, P. E., Abdalla, E. A. H., Kunya, A. B., Eze, V. H. U., & Simon, M. (2026). Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network. F1000Research, 15, 1922. https://doi.org/10.12688/f1000research.193864.1

Vancouver

Julius A, Bubu PE, Abdalla EAH, Kunya AB, Eze VHU, Simon M. Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network. F1000Research. 2026;15:1922. doi:10.12688/f1000research.193864.1

BibTeX
@article{Julius2026,
  author = {Julius, Asiimwe and Bubu, Pius Erheyovwe and Abdalla, Elnazeer Ali Hamid and Kunya, Abdullahi Bala and Eze, Val Hyginus Udoka and Simon, Mugisha},
  title = {Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network},
  journal = {F1000Research},
  year = {2026},
  volume = {15},
  pages = {1922},
  doi = {10.12688/f1000research.193864.1}
}
Kostenlos starten →