Crossref
Improved Five-Map Double-Coefficient Method for Risk Assessment of Floor Limestone Water Inrush—A Case Study of Zhuxianzhuang Coal Mine
Mine Engineering · 2026 · 14 (04) · 1146-1159
DOI: 10.12677/me.2026.144113 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mine Engineering, 2026. Verfasst von 文婷 刘. Die Arbeit nennt 16 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
刘, 文. (2026). Improved Five-Map Double-Coefficient Method for Risk Assessment of Floor Limestone Water Inrush—A Case Study of Zhuxianzhuang Coal Mine. Mine Engineering, 14(04), 1146-1159. https://doi.org/10.12677/me.2026.144113
Vancouver
刘 文. Improved Five-Map Double-Coefficient Method for Risk Assessment of Floor Limestone Water Inrush—A Case Study of Zhuxianzhuang Coal Mine. Mine Engineering. 2026;14(04):1146-1159. doi:10.12677/me.2026.144113
BibTeX
@article{2026,
author = {刘, 文婷},
title = {Improved Five-Map Double-Coefficient Method for Risk Assessment of Floor Limestone Water Inrush—A Case Study of Zhuxianzhuang Coal Mine},
journal = {Mine Engineering},
year = {2026},
volume = {14},
number = {04},
pages = {1146--1159},
doi = {10.12677/me.2026.144113}
}
EUVIMED