Infrastructure Availability and Service-Readiness Performance in Programme-Engaged Primary Health Care Facilities in Edo State, Nigeria: A Cross-Sectional Analysis
Tropical Journal of Medicine and Basic Sciences · 09.09.2026
DOI: 10.1234/t8smdz80 ↗Kurz gefasst
Querschnittstudie in der Zeitschrift Tropical Journal of Medicine and Basic Sciences, erschienen am 09.09.2026. Verfasst von Victor Ohenhen und 5 weiteren Autor:innen.
Abstract (Originalsprache)
Context
PHC investment decisions often assume that reliable power, water, and staffing drive facility performance, an assumption rarely tested against routine supervisory data programmes.
Objectives
To test the association between nine binary infrastructure/operational indicators and ISS-derived service-readiness performance among programme-engaged PHC facilities in Edo State, Nigeria, and whether readiness differs across senatorial districts.
Methods
Secondary cross-sectional analysis of 143 programme-engaged PHC facilities across 18 Local Government Areas of Edo State, assessed in September 2020. A composite service-readiness score (0-5) counted five Saving One Million Lives pillars graded Good; nine predictors were modelled by OLS and logistic regression, with Firth, Poisson, ordinal, and Benjamini-Hochberg robustness checks, and ANOVA with Tukey HSD across districts.
Results
Thirty-one facilities (21.7%) were Good on all five pillars. Power supply (p=0.84), potable water (p=0.28), and staffing (p=0.98) were not associated with readiness, a null robust to sensitivity analyses. Government drug supply showed the most consistent positive association (p=0.011), surviving correction under a threshold-free outcome. The model explained little variance (R-squared=0.144; p=0.012). Readiness differed across districts (p=0.020); rural Edo North had lower staffing than urban Edo South (22.9% vs 50.0%; p=0.009), though the infrastructure null held within every district.
Conclusion
Binary infrastructure indicators had limited explanatory value for ISS-derived readiness in this sample; this most plausibly reflects checklist coarseness rather than evidence that infrastructure is unimportant for PHC performance. Future ISS instruments should measure infrastructure functionality rather than presence alone, capture management and workforce factors, and test government-drug-supply and district signals longitudinally before they guide investment.
Schlagwörter
Zitieren
APA
Ohenhen, V., Okundia, P. O., Irowa, O., David, O. O., Akpojaro, E., & Omorogbe, W. B. (2026). Infrastructure Availability and Service-Readiness Performance in Programme-Engaged Primary Health Care Facilities in Edo State, Nigeria: A Cross-Sectional Analysis. Tropical Journal of Medicine and Basic Sciences. https://doi.org/10.1234/t8smdz80
Vancouver
Ohenhen V, Okundia PO, Irowa O, David OO, Akpojaro E, Omorogbe WB. Infrastructure Availability and Service-Readiness Performance in Programme-Engaged Primary Health Care Facilities in Edo State, Nigeria: A Cross-Sectional Analysis. Tropical Journal of Medicine and Basic Sciences. 2026. doi:10.1234/t8smdz80
BibTeX
@article{Ohenhen2026,
author = {Ohenhen, Victor and Okundia, Patrick Otamere and Irowa, Osamwonyi and David, Odiko Osikemekhai and Akpojaro, Ejovi and Omorogbe, Wisdom B.},
title = {Infrastructure Availability and Service-Readiness Performance in Programme-Engaged Primary Health Care Facilities in Edo State, Nigeria: A Cross-Sectional Analysis},
journal = {Tropical Journal of Medicine and Basic Sciences},
year = {2026},
doi = {10.1234/t8smdz80}
}
EUVIMED