EUVIMEDEUVIMED entdecken
Crossref

Factors Causing Construction Delays: A Survey of Large Housing Projects in India

B Umasankar, S Chattopadhyay, B K Sengupta

Journal of Real Estate, Construction & Management · 2006

DOI: 10.1177/2977657020060402 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Real Estate, Construction & Management, 2006. Verfasst von B Umasankar und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper presents the results of a survey conducted by the researcher to determine the relative significance of principal factors causing construction delays in large group housing projects in India. Questionnaire survey was the primary methodology for the study. The questionnaire consisted of 50 previously identified delay factors, grouped under 10 factor categories. The survey was conducted among two groups – consultants and contractors. The first part of this paper deals with a brief literature review on related studies, the factors considered for the questionnaire design and with the methods of data analysis adopted in this study. The second part dwells upon the analysis of the data collected. According to the consultants, slow decision making by the client, late release of interim payments, contractor’s low overall productivity, subcontractor’s delays and insufficient working capital were the top five delay causing factors. The contractors ranked late release of interim payments, late release of drawings / details, contractor’s low overall productivity, insufficient working capital and poor resource allocation as the key factors resulting in construction delays. Relative agreement between the two groups was analyzed and a comparison of rankings for each of the factor categories is presented in the final part.

Zitieren

APA

Umasankar, B., Chattopadhyay, S., & Sengupta, B. K. (2006). Factors Causing Construction Delays: A Survey of Large Housing Projects in India. Journal of Real Estate, Construction & Management. https://doi.org/10.1177/2977657020060402

Vancouver

Umasankar B, Chattopadhyay S, Sengupta BK. Factors Causing Construction Delays: A Survey of Large Housing Projects in India. Journal of Real Estate, Construction & Management. 2006. doi:10.1177/2977657020060402

BibTeX
@article{Umasankar2006,
  author = {Umasankar, B and Chattopadhyay, S and Sengupta, B K},
  title = {Factors Causing Construction Delays: A Survey of Large Housing Projects in India},
  journal = {Journal of Real Estate, Construction & Management},
  year = {2006},
  doi = {10.1177/2977657020060402}
}
Kostenlos starten →