EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC 4.0

Diagnosing short-term pit–crusher decoupling from routine production reports: A source-audited field study

Hussein A. Saleem, Abdallah Al-Abass

Mining Technology: Transactions of the Institutions of Mining and Metallurgy · 05.11.2026

DOI: 10.1177/25726668261504330 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Mining Technology: Transactions of the Institutions of Mining and Metallurgy, online erschienen am 05.11.2026. Verfasst von Hussein A. Saleem und 1 weiteren Autor:innen. Die Arbeit nennt 34 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Routine production reports separate pit haulage, equipment hours, material classes and crusher feed, potentially obscuring the source of short-term losses. We developed a source-audited diagnostic workflow using 19 consecutive daily report packages from an anonymised open-pit operation. Reconciliation provided 38 pit shifts, 18 daily fleet-hour observations and 34 matched pit–crusher shifts. Same-shift total loads and crusher tally were weakly associated (Pearson r = 0.108, p = 0.543); ore-based proxies showed similarly weak relationships. Threshold screening identified five discordant shifts, three of which met a stricter median-absolute-deviation (MAD) criterion. In the strongest upstream case, low fleet-hour coverage coincided with near-median crusher feed, while loads per active truck-hour remained comparable to reference shifts. In three downstream cases, reduced crusher tally coincided with maintenance/STOP annotations while pit haulage continued. These annotations provide internal documentary concordance, not independent validation. A nine-day single-truck outage offered asset-reliability context without a clear fleet-hour or night crusher-feed collapse. Under hypothetical input changes of up to 20%, four events retained their threshold classifications, although the upstream MAD-core event lost that status at 10%. The workflow identifies recorded pit–crusher mismatches without establishing inventory buffering, material rerouting or other causal mechanisms.

Zitieren

APA

Saleem, H. A., & Al-Abass, A. (2026). Diagnosing short-term pit–crusher decoupling from routine production reports: A source-audited field study. Mining Technology: Transactions of the Institutions of Mining and Metallurgy. https://doi.org/10.1177/25726668261504330

Vancouver

Saleem HA, Al-Abass A. Diagnosing short-term pit–crusher decoupling from routine production reports: A source-audited field study. Mining Technology: Transactions of the Institutions of Mining and Metallurgy. 2026. doi:10.1177/25726668261504330

BibTeX
@article{Saleem2026,
  author = {Saleem, Hussein A. and Al-Abass, Abdallah},
  title = {Diagnosing short-term pit–crusher decoupling from routine production reports: A source-audited field study},
  journal = {Mining Technology: Transactions of the Institutions of Mining and Metallurgy},
  year = {2026},
  doi = {10.1177/25726668261504330}
}
Kostenlos starten →