A New Indirect Method for Analyzing the Rock Bridge Length of Toppling Rock
Advances in Civil Engineering · 2026-01 · 2026 (1)
DOI: 10.1155/adce/9213178 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances in Civil Engineering, online erschienen am 25.06.2026. Verfasst von Dongfang Gao und 7 weiteren Autor:innen. Die Arbeit nennt 34 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
(1) Rock bridge cracking is a key factor controlling toppling failure. Previous studies have suggested a potential relationship between fundamental natural frequency and rock bridge length, but frequency‐only identification may introduce systematic error when the damping effect becomes non‐negligible during rock bridge deterioration. (2) In this study, an improved dynamic analysis method was developed to quantify rock bridge length by jointly considering the fundamental natural frequency and damping ratio. The method was validated through indoor tests in the Y and Z vibration directions and was further examined using a dangerous toppling rock case in the Sichuan Province, China. (3) The experimental results show that the average error of the improved method is 6.28% and 6.36% in the Y and Z directions, respectively, which is lower than that of the original frequency‐only method (9.49% and 9.73%). The correction is most evident in the unstable stage, where the damping effect becomes more influential as the effective rock bridge shortens. (4) The field case provides preliminary engineering support for the proposed indirect identification framework. The method should be interpreted as an engineering approximation for evaluating the effective bonded portion of the structural plane, rather than as a direct measurement of the full three‐dimensional bonded area.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Gao, D., Zhao, P., Zou, C., Shen, J., Wang, T., Zhao, Y., Chi, Z., & Guan, P. (2026). A New Indirect Method for Analyzing the Rock Bridge Length of Toppling Rock. Advances in Civil Engineering, 2026(1). https://doi.org/10.1155/adce/9213178
Vancouver
Gao D, Zhao P, Zou C, Shen J, Wang T, Zhao Y, et al. A New Indirect Method for Analyzing the Rock Bridge Length of Toppling Rock. Advances in Civil Engineering. 2026;2026(1). doi:10.1155/adce/9213178
BibTeX
@article{Gao2026,
author = {Gao, Dongfang and Zhao, Peng and Zou, Chunlei and Shen, Jueming and Wang, Tao and Zhao, Yong and Chi, Zecheng and Guan, Peng},
title = {A New Indirect Method for Analyzing the Rock Bridge Length of Toppling Rock},
journal = {Advances in Civil Engineering},
year = {2026},
volume = {2026},
number = {1},
doi = {10.1155/adce/9213178}
}
EUVIMED