Research on the Cooperation Scheme of New‐Energy Machinery and Conventional Fuel‐Powered Machinery During the Construction of High‐Altitude Tunnels
Advances in Civil Engineering · 2026-01 · 2026 (1)
DOI: 10.1155/adce/6073574 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances in Civil Engineering, online erschienen am 23.07.2026. Verfasst von Jian’an Gao und 5 weiteren Autor:innen. Die Arbeit nennt 39 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
In the construction of high‐altitude long tunnels, dense emission sources near the tunnel face and long ventilation distances pose significant challenges to construction safety. New‐energy machinery has clear advantages over conventional fuel‐powered machinery in controlling pollutant emissions; however, full replacement is difficult in practical projects, and quantitative comparative studies on different machinery configurations remain limited. Based on a highway tunnel project under construction in Gansu Province, this study designed three machinery‐allocation scenarios and employed a combined approach of field monitoring, ANSYS Fluent numerical simulation, and entropy‐weight comprehensive evaluation to compare environmental safety, construction efficiency, and economic performance. The results show that, in the measured data, the differences in carbon monoxide (CO) concentration among the three schemes were most significant during the 0–30 min period. In this period, compared with scheme 1, scheme 2 reduced the average CO concentration and the full‐period peak value by 25.26% and 22.96%, respectively; scheme 3 further reduced these two indicators by 38.50% and 36.17%, respectively, compared with scheme 2. Meanwhile, the transport capacity of scheme 3 reached 20.47 m 3 /h, which was 5.35% and 7.40% higher than that of the other two schemes. The energy and maintenance costs of a single new‐energy muck truck were 209.66 and 14.24 CNY/day, respectively, less than 46% of those of the fuel‐powered truck. The entropy‐weight evaluation of the measured data further supported the earlier findings. The coefficients of determination ( R 2 ) between the simulated and measured data were 0.966, 0.908, and 0.917, respectively, indicating that the simulation results can serve as a useful reference for comparing different operating conditions. The study demonstrates that, during high‐altitude long‐tunnel construction, source‐organization optimization can reduce early‐stage CO concentration by 23%–25%, while new‐energy machinery can achieve more substantial environmental and economic benefits without sacrificing transport efficiency. This study reveals the differentiated effects of organizational optimization and energy substitution, and proposes a layered collaborative optimization pathway applicable to scenarios involving the coexistence of mixed machinery.
Zitieren
APA
Gao, J., Hu, B., Wang, T., He, Q., Jiang, J., & Wang, Z. (2026). Research on the Cooperation Scheme of New‐Energy Machinery and Conventional Fuel‐Powered Machinery During the Construction of High‐Altitude Tunnels. Advances in Civil Engineering, 2026(1). https://doi.org/10.1155/adce/6073574
Vancouver
Gao J, Hu B, Wang T, He Q, Jiang J, Wang Z. Research on the Cooperation Scheme of New‐Energy Machinery and Conventional Fuel‐Powered Machinery During the Construction of High‐Altitude Tunnels. Advances in Civil Engineering. 2026;2026(1). doi:10.1155/adce/6073574
BibTeX
@article{Gao2026,
author = {Gao, Jian’an and Hu, Bin and Wang, Tian and He, Qingwen and Jiang, Jin and Wang, Zhengzhen},
title = {Research on the Cooperation Scheme of New‐Energy Machinery and Conventional Fuel‐Powered Machinery During the Construction of High‐Altitude Tunnels},
journal = {Advances in Civil Engineering},
year = {2026},
volume = {2026},
number = {1},
doi = {10.1155/adce/6073574}
}
EUVIMED