Seismic Fragility Analysis and Postearthquake Recovery Studies of Medium‐to‐Small Span Bridges With Cast‐in‐Place or Precast Columns
Advances in Civil Engineering · 2026-01 · 2026 (1)
DOI: 10.1155/adce/5207952 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances in Civil Engineering, online erschienen am 29.07.2026. Verfasst von Haoyang Zhou und 2 weiteren Autor:innen. Die Arbeit nennt 20 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Key Research and Development Program of China, National Natural Science Foundation of China.
Abstract (Originalsprache)
To support bridge rehabilitation sequence optimization, seismic planning, and seismic economic loss estimation, this study develops nonlinear finite element (FE) models for representative medium‐to‐small span highway bridges with cast‐in‐place (CIP) and precast assembled piers in the southeastern coastal region of China. Thirty ground‐motion records selected from the PEER Strong Motion Database and five material‐uncertainty bridge models were combined to generate 300 nonlinear time‐history analyses. Peak ground acceleration (PGA) was selected as the intensity measure (IM), and five engineering demand parameters (EDPs) were adopted: nonseismically designed pier curvature ductility, seismically designed pier curvature ductility, bearing displacement, abutment passive displacement, and abutment active displacement. At PGA = 0.85 g, nonseismically designed pier failure probabilities for CIP bridges were 0.75, 0.62, 0.42, and 0.35 from slight to complete damage, while the corresponding values for precast bridges were 0.17, 0.08, 0.06, and 0.04. Bearings remained the most vulnerable components in the precast bridge system, with probabilities of 0.91, 0.47, 0.36, and 0.22. The innovation of this study is the integrated comparison of CIP and precast assembled bridge systems by combining component fragility, system fragility, and postearthquake recovery indicators within one probabilistic framework. The results indicate that the precast pier scheme reduces pier fragility, especially under severe and complete damage states, but bearings and abutments remain critical components. A scenario‐based recovery analysis assumes that modular replacement can shorten pier repair duration by 20%, giving 6, 24, 96, and 320 days for slight, moderate, severe, and complete damage, respectively; this assumption should be refined with project‐specific construction data.
Förderung
- National Key Research and Development Program of China
- National Natural Science Foundation of China
Zitieren
APA
Zhou, H., Ge, S., & Bu, Z. (2026). Seismic Fragility Analysis and Postearthquake Recovery Studies of Medium‐to‐Small Span Bridges With Cast‐in‐Place or Precast Columns. Advances in Civil Engineering, 2026(1). https://doi.org/10.1155/adce/5207952
Vancouver
Zhou H, Ge S, Bu Z. Seismic Fragility Analysis and Postearthquake Recovery Studies of Medium‐to‐Small Span Bridges With Cast‐in‐Place or Precast Columns. Advances in Civil Engineering. 2026;2026(1). doi:10.1155/adce/5207952
BibTeX
@article{Zhou2026,
author = {Zhou, Haoyang and Ge, Shengliang and Bu, Zhanyu},
title = {Seismic Fragility Analysis and Postearthquake Recovery Studies of Medium‐to‐Small Span Bridges With Cast‐in‐Place or Precast Columns},
journal = {Advances in Civil Engineering},
year = {2026},
volume = {2026},
number = {1},
doi = {10.1155/adce/5207952}
}
EUVIMED